Construction Project Scheduling Training Course

Duration 10 days 20 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Project Managers, Planning Engineers and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 9 Nov 2026 Course code SD-CM-087

Before you join: Participants should have experience of construction projects and understand common project phases, drawings, quantities, subcontract packages and site reporting.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Construction schedules fail when scope is converted into dates without credible logic, production data, resource constraints or agreement from the teams performing the work. The result is missed milestones, trade interference, unreliable progress reports, claims exposure and late warning of delay. Project managers, planners and site leaders need schedules that explain how work will be built, tested, handed over and recovered when conditions change.

This course develops the practical methods used to prepare, review and control construction schedules. Participants build work breakdown structures, logic networks, critical path schedules, resource and cost-loaded plans, short-interval programmes and recovery schedules. They apply the Critical Path Method, schedule quality checks, earned value measures, delay analysis principles and the DCMA 14-Point Schedule Assessment. Attention is given to procurement, design release, long-lead items, subcontractor interfaces, weather allowances, commissioning and contractual milestones.

Teaching combines concise technical briefings with construction cases, schedule reviews, group planning work and simulator-based schedule updates. Participants work progressively on a realistic project schedule from the first week, using planning data, productivity assumptions, constraints and progress records. They leave with a complete baseline and control package that can be adapted for a building, infrastructure, industrial or energy project.

The course suits professionals responsible for planning, coordinating, reporting or assuring project delivery. It is particularly relevant where several contractors, complex interfaces, phased handovers or strict completion dates make informal planning insufficient.

What you will be able to do

  • Develop a work breakdown structure and coding system for a construction schedule
  • Build a logic-linked Critical Path Method schedule from defined construction scope
  • Calculate activity durations using quantities, productivity rates and crew assumptions
  • Resource-load and cost-load schedules to test workforce and cash flow requirements
  • Apply schedule quality checks using the DCMA 14-Point Schedule Assessment
  • Update baseline schedules using progress measurement, actuals and remaining durations
  • Analyse delay events using contemporaneous records, logic and critical path evidence
  • Present a complete construction baseline schedule and schedule control plan

Benefits of attending

For you

  • Produce logic-linked programmes that withstand client and contractor review
  • Identify critical work, float erosion and near-critical delivery risks earlier
  • Convert site progress records into defensible schedule updates and forecasts
  • Contribute informed evidence during extension-of-time and delay discussions
  • Build a reusable planning portfolio for future construction assignments

For your organisation

  • Earlier warning of milestone threats, procurement delays and trade-interface conflicts
  • More reliable forecasts for completion dates, labour demand and cash requirements
  • Consistent schedule quality standards across projects, contractors and reporting cycles
  • Better substantiation of time-impact decisions, notices and extension-of-time submissions
  • Improved coordination between design, procurement, site operations and commissioning teams

Course modules

20 modules over 10 days

Participants can define the schedule architecture needed to plan and control construction delivery.

  • Schedule purposes for tendering, baseline control, reporting and contractual administration
  • Level one through level four schedules and their intended decisions
  • Work breakdown structure aligned with scope, location and responsibility
  • Organisational breakdown structure for client, contractor and subcontractor accountability
  • Schedule coding dictionaries supporting filters, reports and progress analysis
  • Milestone registers linking contractual dates, approvals and sectional completion

Participants can translate construction scope into measurable and schedulable work packages.

  • Drawing registers and specifications used to define planning scope
  • Decompose deliverables into work packages with clear completion criteria
  • Location breakdown structures for buildings, corridors, zones and elevations
  • Construction work packages separated by discipline, trade and workfront
  • Control accounts connecting schedule packages with cost management structures
  • Scope assumptions registers recording exclusions, interfaces and unresolved information

Participants can create activities and estimate achievable durations using production evidence.

  • Activity definitions written with measurable starts, finishes and ownership
  • Quantity take-offs converted into production-based activity duration estimates
  • Crew productivity rates adjusted for access, learning and congestion
  • Calendars reflecting shifts, working hours, holidays and weather allowances
  • Discrete activities, level-of-effort activities and milestone events distinguished clearly
  • Duration assumptions documented for later review during schedule updates

Participants can create logic networks that represent the intended construction sequence.

  • Finish-to-start relationships applied to conventional construction work sequences
  • Start-to-start and finish-to-finish relationships used with justified lags
  • Predecessor and successor logic tested at trade and workfront interfaces
  • Lead and lag restrictions assessed against contractual scheduling requirements
  • Network diagrams expose missing logic, open ends and circular relationships
  • Physical constraints separated from planning preferences and imposed dates

Participants can interpret critical path calculations and explain schedule-driving activities.

  • Forward pass calculations establish early dates through the network
  • Backward pass calculations identify late dates and total float
  • Critical Path Method identifies activities controlling the forecast completion date
  • Near-critical paths reviewed using low-float thresholds and sensitivity testing
  • Free float distinguished from total float for interface management
  • Multiple critical paths assessed where parallel completion conditions exist

Participants can prepare a credible baseline programme for approval and future control.

  • Baseline scope checked against contract documents and tender commitments
  • Design release dates integrated with procurement and construction sequencing
  • Long-lead equipment schedules linked to fabrication, delivery and installation
  • Subcontractor programmes incorporated without losing principal contractor control
  • Approval workflows establish baseline ownership, revision status and issue dates
  • Basis-of-schedule narratives record methods, assumptions, calendars and constraints

Participants can resource-load activities and identify workforce demand conflicts.

  • Labour crews assigned using production rates and planned work quantities
  • Plant resources matched to activity needs, availability and operating constraints
  • Resource histograms reveal peaks, gaps and unsustainable labour demand
  • Resource levelling compares delayed activities against contractual completion obligations
  • Trade stacking risks identified through location-based resource demand reviews
  • Manpower curves prepared for mobilisation, peak production and demobilisation

Participants can connect schedule dates with planned cost and payment forecasts.

  • Cost accounts mapped to schedule activities and work package budgets
  • Planned value curves generated from time-phased cost-loaded activities
  • Cash flow forecasts reflect payment terms, retention and procurement deposits
  • Cost loading distinguishes direct costs, preliminaries and owner-supplied equipment
  • Monthly valuation dates aligned with measurable schedule progress rules
  • Forecast expenditure tested against funding limits and approved budgets

Participants can schedule non-construction dependencies that govern site production.

  • Procurement schedules trace requisition, approval, manufacture, inspection and delivery
  • Design deliverable schedules identify information required before field release
  • Interface registers connect civil, structural, mechanical and electrical dependencies
  • Vendor data dates incorporated into fabrication and installation logic
  • Temporary works sequenced with permanent works and access requirements
  • Commissioning prerequisites linked to installation, testing and energisation activities

Participants can convert master schedule requirements into actionable field plans.

  • Six-week look-ahead schedules extracted from approved baseline programme logic
  • Last Planner System commitments connect weekly work plans with constraints
  • Constraint logs track drawings, materials, access, permits and predecessor work
  • Make-ready planning removes blockers before crews reach planned workfronts
  • Percent plan complete measures weekly commitment reliability and learning
  • Daily coordination boards align trade activities, areas and safety controls

Participants can establish progress rules and collect update data suitable for forecasting.

  • Progress measurement rules define objective credit for completed work
  • Physical percent complete calculated from quantities, installed units and milestones
  • Actual start and finish dates captured from verified field records
  • Remaining duration forecasts tested against current productivity and constraints
  • Site diaries, photographs and inspection records support update evidence
  • Data dates set clear boundaries between actual performance and forecast work

Participants can update schedules and communicate reliable completion forecasts.

  • Status updates apply actual dates, progress quantities and remaining durations
  • Out-of-sequence progress assessed using retained logic and progress override
  • Data-date discipline prevents future work from appearing as completed performance
  • Schedule recalculation identifies changed critical paths and completion forecasts
  • Update narratives explain variance causes, corrective actions and decision needs
  • Forecast milestones compared with baseline dates and contractual obligations

Participants can assess schedule integrity and correct common programme defects.

  • DCMA 14-Point Schedule Assessment tests logic, leads, lags and float
  • Missing predecessors and successors identified through open-end schedule checks
  • Excessive constraints examined for concealed logic and artificial critical paths
  • Long-duration activities reviewed against reporting and control requirements
  • Negative float investigated through imposed dates, logic and calendar conflicts
  • Schedule health reports prioritise corrections before baseline approval or update

Participants can produce schedule reports matched to management and site decisions.

  • Bar charts tailored for executives, package managers and field supervisors
  • Milestone reports highlight decisions, approvals and emerging completion risks
  • Critical path narratives explain causes rather than merely listing activities
  • Two-week plans communicate workable tasks to trade and subcontractor teams
  • S-curves compare planned, actual and forecast progress against baselines
  • Reporting calendars align update cycles with governance and payment milestones

Participants can assess schedule uncertainty and plan practical time-risk responses.

  • Risk registers connect uncertain events with affected schedule activities
  • Three-point duration estimates establish optimistic, likely and pessimistic ranges
  • Monte Carlo simulation interprets confidence levels for completion milestones
  • Schedule contingency distinguished from hidden float and unallocated management reserve
  • Weather risk allowances based on historical workability and exposed activities
  • Risk response actions assigned with triggers, owners and review dates

Participants can evaluate delay events using schedule records and defensible analysis principles.

  • Delay event records preserve notices, instructions, photographs and contemporaneous updates
  • Excusable, compensable and concurrent delay concepts distinguished contractually
  • Time impact analysis inserts prospective events into approved schedule logic
  • Windows analysis reviews critical path movement during defined update periods
  • As-planned versus as-built analysis identifies broad sequence and duration variance
  • Concurrency assessment examines overlapping critical delays and party responsibility

Participants can prepare recovery options that address identified completion delay.

  • Recovery schedules target critical and near-critical activities causing forecast delay
  • Crashing options evaluate added crews, shifts, plant and supervision costs
  • Fast tracking assesses resequencing opportunities and increased coordination risks
  • Productivity improvement actions test workfront release, logistics and prefabrication
  • Acceleration plans quantify time savings, costs, risks and required approvals
  • Recovery dashboards track planned gains against achieved completion improvements

Participants can organise schedule data and apply core functions in planning software.

  • Primavera P6 activity codes, calendars and layouts support controlled schedule development
  • Microsoft Project views expose logic, critical tasks and resource allocations
  • Schedule templates standardise coding, calendars, relationships and report formats
  • Baseline copies preserved with controlled revisions and documented authorisation
  • Import and export checks protect dates, codes and relationship integrity
  • Version registers identify issued programmes, update dates and approval status

Participants can conduct a structured review of a contractor or subcontractor programme.

  • Review checklists test scope coverage, logic, durations and contractual milestones
  • Constructability reviews challenge access, sequencing and trade-interface assumptions
  • Resource feasibility checks compare planned crews with available workforce capacity
  • Procurement reviews test long-lead dates against installation and commissioning needs
  • Baseline review comments distinguish mandatory corrections from planning recommendations
  • Acceptance criteria document required evidence before programme approval

Participants can build, review and present a complete baseline construction schedule and control plan for a realistic project.

  • Project scope converted into coded work breakdown and activity register
  • Logic-linked baseline schedule developed with calendars, milestones and critical path
  • Resources and costs loaded to produce workforce and cash flow forecasts
  • Procurement, design, testing and commissioning interfaces incorporated into programme logic
  • DCMA quality findings resolved through documented schedule corrections and assumptions
  • Progress update, recovery response and management report presented for review

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Construction schedule basis-of-schedule template
  2. Logic and interface review checklist
  3. Resource-loaded baseline programme model
  4. Six-week look-ahead planning template
  5. DCMA schedule quality assessment checklist
  6. Schedule update and recovery action plan

Who should attend

  • Project Managers — need credible programmes for commitments, reporting and corrective action
  • Planning Engineers — build and maintain logic-linked schedules for complex construction work
  • Construction Managers — coordinate trades, work fronts and short-term production priorities
  • Site Engineers — translate field progress and constraints into reliable schedule updates
  • Contract Managers — assess time impacts, notices and schedule-based claims evidence
  • Quantity Surveyors — connect programme dates with cost, cash flow and procurement decisions

Skills and tools covered

Critical path schedulingResource loadingProgress measurementSchedule quality assuranceDelay analysisRecovery planning

Tools and standards

Primavera P6, Microsoft Project, Critical Path Method, DCMA 14-Point Schedule Assessment

How the course runs

Training methodology

The course uses short technical briefings followed by construction-based case work, group planning tasks, schedule review sessions and update simulations. Participants develop schedules from scope information, quantities, productivity data, procurement registers and site progress reports. Instructor demonstrations show how logic, calendars, constraints, resources and baselines affect forecast dates. Teams examine flawed programmes, identify quality issues and prepare corrective actions. Individual application planning helps participants adapt the methods, templates and review routines to their own project controls environment.

Requirements and prerequisites

Participants should have experience of construction projects and understand common project phases, drawings, quantities, subcontract packages and site reporting. Familiarity with basic project management terms, including activities, milestones, dependencies and progress reporting, is useful. Participants should be comfortable working with spreadsheets and interpreting simple bar charts. Prior use of Primavera P6 or Microsoft Project is helpful but not required; software techniques are explained through guided examples. This is not an introductory construction management course, and it does not require advanced mathematics, programming, formal planning certification or previous delay-claims experience.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

You should understand construction project phases, drawings, work packages and basic progress reporting. Previous use of Primavera P6 or Microsoft Project is useful but not required, as the course explains the scheduling concepts before software-oriented application.

Bring a laptop if attending online and, if permitted, a non-confidential programme, progress report or planning challenge from your current work. Course cases, templates and planning data are provided.

It is designed for project managers, planning engineers, construction managers, site engineers, contract managers and quantity surveyors. It is best suited to professionals already involved in construction delivery rather than those seeking a general introduction to project management.

The course concentrates on construction sequencing, trade interfaces, productivity-based durations, procurement dependencies, site progress and contractual schedule evidence. General project management subjects such as leadership, procurement strategy and stakeholder management are addressed only where they affect schedule control.

Participants can use the schedule basis, quality checklist, look-ahead template and update routines on active projects. The methods help review contractor programmes, improve update narratives and identify completion threats before formal reporting dates.

Each training day runs from 08:30 to 16:30 and provides about 6.5 contact hours. The first week develops baseline planning methods, while the second week focuses on updating, assurance, delay, recovery and the final integrated capstone.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.