Construction schedules fail when scope is converted into dates without credible logic, production data, resource constraints or agreement from the teams performing the work. The result is missed milestones, trade interference, unreliable progress reports, claims exposure and late warning of delay. Project managers, planners and site leaders need schedules that explain how work will be built, tested, handed over and recovered when conditions change.
This course develops the practical methods used to prepare, review and control construction schedules. Participants build work breakdown structures, logic networks, critical path schedules, resource and cost-loaded plans, short-interval programmes and recovery schedules. They apply the Critical Path Method, schedule quality checks, earned value measures, delay analysis principles and the DCMA 14-Point Schedule Assessment. Attention is given to procurement, design release, long-lead items, subcontractor interfaces, weather allowances, commissioning and contractual milestones.
Teaching combines concise technical briefings with construction cases, schedule reviews, group planning work and simulator-based schedule updates. Participants work progressively on a realistic project schedule from the first week, using planning data, productivity assumptions, constraints and progress records. They leave with a complete baseline and control package that can be adapted for a building, infrastructure, industrial or energy project.
The course suits professionals responsible for planning, coordinating, reporting or assuring project delivery. It is particularly relevant where several contractors, complex interfaces, phased handovers or strict completion dates make informal planning insufficient.