Course overview
Construction site engineers and supervisors must convert drawings, specifications and contract requirements into safe, controlled daily production. Poor coordination between trades, late material releases, unclear work fronts and weak records can quickly create delay, rework, claims and safety exposure. Site leaders need practical control systems that connect the baseline programme, short-term plans, labour, plant, quality inspections and commercial records.
This course develops the working methods expected of site engineers, section engineers, assistant construction managers and supervisors. Participants learn to interpret project documents; establish site logistics; plan work using work breakdown structures, critical path method scheduling and look-ahead planning; control labour, materials and equipment; manage subcontractors; inspect quality; administer permits and safety controls; and maintain records for payment, change and claims. The course also addresses progress measurement, earned value indicators, risk registers, reporting and handover.
Teaching combines focused instructor briefings with construction cases, planning workshops, group reviews and site-management simulations. Participants progressively build a Site Management Plan using a realistic building or infrastructure project case, then test it against disruption, design change, delayed deliveries and safety incidents. They leave with reusable planning, control and reporting templates that can be adapted to their current projects.
The course is suited to professionals moving from technical engineering or trade supervision into broader responsibility for coordinating site operations and controlling construction delivery.