Construction Site Management and Supervision Training Course

Duration 10 days 20 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Site Engineers, Assistant Construction Managers and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 9 Nov 2026 Course code SD-CM-089

Before you join: Participants should have basic familiarity with construction projects, common site activities and technical drawings, gained through engineering, supervision, quantity surveying or trade experience.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Construction site engineers and supervisors must convert drawings, specifications and contract requirements into safe, controlled daily production. Poor coordination between trades, late material releases, unclear work fronts and weak records can quickly create delay, rework, claims and safety exposure. Site leaders need practical control systems that connect the baseline programme, short-term plans, labour, plant, quality inspections and commercial records.

This course develops the working methods expected of site engineers, section engineers, assistant construction managers and supervisors. Participants learn to interpret project documents; establish site logistics; plan work using work breakdown structures, critical path method scheduling and look-ahead planning; control labour, materials and equipment; manage subcontractors; inspect quality; administer permits and safety controls; and maintain records for payment, change and claims. The course also addresses progress measurement, earned value indicators, risk registers, reporting and handover.

Teaching combines focused instructor briefings with construction cases, planning workshops, group reviews and site-management simulations. Participants progressively build a Site Management Plan using a realistic building or infrastructure project case, then test it against disruption, design change, delayed deliveries and safety incidents. They leave with reusable planning, control and reporting templates that can be adapted to their current projects.

The course is suited to professionals moving from technical engineering or trade supervision into broader responsibility for coordinating site operations and controlling construction delivery.

What you will be able to do

  • Interpret drawings, specifications, bills of quantities and contract documents for site execution
  • Develop a site logistics plan covering access, welfare, storage, lifting and work zones
  • Create baseline and look-ahead schedules using work breakdown structures and critical path method logic
  • Control labour, materials, plant and subcontractors against planned production targets
  • Apply inspection and test plans, nonconformance procedures and quality records to construction work
  • Implement task risk assessments, permit-to-work controls and daily safety supervision routines
  • Measure progress, analyse schedule and cost variance, and produce action-focused site reports
  • Prepare and present an integrated Site Management Plan for a live-project scenario

Benefits of attending

For you

  • Produce credible short-term plans rather than reacting to daily site problems
  • Lead coordination meetings with clear work-front, resource and constraint data
  • Identify quality and safety control points before work begins
  • Build records that support payment applications, change notices and claims responses
  • Progress into site engineer, section engineer or construction management roles

For your organisation

  • More reliable weekly production through disciplined look-ahead planning
  • Fewer work-front clashes between trades, deliveries, lifting operations and inspections
  • Earlier identification of programme slippage, resource gaps and procurement constraints
  • Stronger quality evidence and faster closure of defects and nonconformances
  • Better site records for client reporting, payment certification and dispute avoidance

Course modules

20 modules over 10 days

Participants can define the site engineer's operational responsibilities, authority limits and daily control routines.

  • Site engineer accountabilities from mobilisation through practical completion and handover
  • Interfaces between client, consultant, contractor, subcontractor and statutory inspector roles
  • Daily control cycle linking planning, execution, inspection, records and corrective action
  • Site organisation charts, delegation matrices and escalation routes for decisions
  • Construction documents establishing scope, standards, sequence and acceptance requirements
  • Daily diary content recording weather, labour, plant, events and instructions

Participants can extract executable work requirements from drawings, specifications and contract documents.

  • Drawing registers, revision clouds and document status controls before construction
  • Reading plans, sections, elevations and details for work-package planning
  • Specification clauses defining materials, workmanship, testing and acceptance criteria
  • Bills of quantities linked to drawings, specifications and measurement rules
  • Request for information process resolving discrepancies before site execution
  • Technical submittal registers tracking approvals for materials, samples and method statements

Participants can prepare a practical site logistics plan for safe and efficient operations.

  • Site logistics drawings locating gates, roads, welfare, storage and exclusion zones
  • Traffic management plans separating pedestrians, delivery vehicles and mobile plant
  • Temporary works requirements for access, excavation support, lifting and formwork
  • Material laydown planning based on delivery sequence, lifting reach and security
  • Welfare facilities sized for workforce numbers, shift patterns and statutory requirements
  • Emergency access routes, muster points and fire-point locations on logistics plans

Participants can divide project scope into controllable work packages with clear handoffs.

  • Work breakdown structure developed from deliverables, locations and construction disciplines
  • Work packages defining scope boundaries, predecessors, resources and acceptance criteria
  • Location-based planning identifying repetitive zones, floors, sections and chainages
  • Responsibility assignment matrix using RACI for work-package ownership and approvals
  • Interface registers recording handoffs between civil, structural, MEP and finishing trades
  • Constraint logs identifying design, access, material and inspection dependencies

Participants can build and interpret a logic-linked baseline schedule for site delivery.

  • Critical path method logic using finish-to-start and lead-lag relationships
  • Activity durations estimated from quantities, productivity rates and available resources
  • Network diagrams identifying critical activities, float and schedule sensitivity
  • Milestone schedules linking contractual dates, approvals, procurement and construction completion
  • Resource loading exposing labour, plant and material demand by period
  • Baseline programme review checking logic gaps, excessive constraints and missing interfaces

Participants can prepare rolling look-ahead plans that release workable tasks to crews.

  • Six-week look-ahead schedules derived from the approved baseline programme
  • Make-ready planning verifies drawings, labour, materials, access and permits
  • Weekly work plans assign measurable commitments to supervisors and subcontractors
  • Percent plan complete measures completed promises against weekly planned tasks
  • Reasons-for-variance coding identifies recurring causes of missed production commitments
  • Constraint removal meetings assign owners, due dates and escalation actions

Participants can match resources to planned output and detect emerging productivity problems.

  • Crew composition planned from activity quantities, productivity norms and sequence
  • Labour histograms compare planned manpower with attendance and work-front availability
  • Plant allocation considers capacity, utilisation, maintenance windows and operator competence
  • Material schedules connect approved submittals, procurement lead times and delivery dates
  • Daily resource reports record labour hours, equipment hours, deliveries and downtime
  • Productivity tracking compares installed quantities against planned labour-hour performance

Participants can coordinate subcontractors through defined responsibilities, meetings and performance controls.

  • Subcontract scope matrices clarify boundaries, inclusions, exclusions and interface responsibilities
  • Pre-start meetings confirm drawings, method statements, resources and acceptance criteria
  • Daily coordination meetings align work fronts, deliveries, lifting and shared access
  • Subcontractor progress measured through installed quantities, milestones and inspection releases
  • Instruction registers track verbal directions, confirmations, responses and close-out dates
  • Performance reviews address missed commitments, quality defects and safety observations

Participants can develop method statements that control sequence, resources, risks and quality checks.

  • Method statement structure covering scope, sequence, resources, hazards and controls
  • Construction sequence defines predecessor completion, hold points and trade handoffs
  • Plant and lifting requirements verified against load charts and access conditions
  • Task briefings communicate approved methods, drawings, hazards and quality expectations
  • Hold-point registers identify work requiring consultant or client release
  • Work permits linked to method statements for controlled high-risk activities

Participants can establish inspection controls and evidence conformity against project requirements.

  • Inspection and test plans define hold points, witnesses and acceptance records
  • Checklists translate drawings and specifications into observable workmanship requirements
  • Material receiving inspections verify quantities, condition, certificates and approved sources
  • Mock-ups establish agreed workmanship standards before repetitive production begins
  • Nonconformance reports document defects, root causes, correction and verification
  • ISO 9001 principles applied to document control, traceability and corrective action

Participants can supervise daily safety and environmental controls for planned construction activities.

  • Task risk assessments identify hazards, exposed persons, controls and residual risk
  • Permit-to-work systems control excavation, confined space, hot work and electrical tasks
  • Toolbox talks address changing conditions, specific hazards and worker responsibilities
  • Daily safety inspections check access, housekeeping, barriers, PPE and plant condition
  • Incident reporting preserves facts, evidence, immediate actions and investigation records
  • Environmental controls manage dust, noise, waste, spills and water discharge

Participants can measure physical progress and identify schedule or cost performance variance.

  • Quantity take-offs establish measurable progress units for each work package
  • Rules of credit define earned progress for partial and completed activities
  • Planned value, earned value and actual cost calculations for site control
  • Schedule performance index and cost performance index interpreted for corrective action
  • Progress photographs linked to locations, dates, quantities and inspection status
  • S-curves compare planned, actual and forecast cumulative project progress

Participants can maintain site records that support cost control and payment certification.

  • Cost codes align labour, materials, plant and subcontract work packages
  • Daily cost reports compare committed, incurred and forecast expenditure
  • Measurement sheets substantiate completed quantities for interim payment applications
  • Daywork records capture labour, plant, materials, signatures and supporting evidence
  • Waste tracking identifies losses from damage, over-ordering, rework and poor storage
  • Forecast final cost updated from productivity, commitments and anticipated changes

Participants can document change and delay events using contemporaneous site evidence.

  • Change registers record instruction dates, scope effects, notices and valuation status
  • Early warning notices identify potential time, cost, quality and safety effects
  • Delay logs capture events, affected activities, evidence and mitigation actions
  • Contemporaneous records include diaries, photographs, correspondence and resource reports
  • Time impact analysis tests schedule consequences of instructed or disruptive events
  • FIDIC notice provisions considered when recording variations, claims and extensions

Participants can maintain a site risk register and formulate recovery actions for disrupted work.

  • Risk registers assess probability, impact, response owner and review date
  • Risk scoring matrices prioritise threats to safety, time, cost and quality
  • Mitigation actions reduce exposure through alternative methods, resources or sequencing
  • Recovery schedules resequence work, add resources and protect critical milestones
  • What-if analysis tests weather delays, procurement failures and access restrictions
  • Escalation thresholds trigger management intervention before risks become delay events

Participants can produce concise site reports and run action-led coordination meetings.

  • Daily reports summarise work completed, resources, issues, inspections and weather
  • Weekly reports present planned-versus-actual progress, constraints, risks and recovery actions
  • Meeting agendas focus on decisions, commitments, owners and due dates
  • Action trackers record status, evidence of closure and overdue escalation
  • Progress dashboards display milestones, productivity, quality defects and safety indicators
  • Communication protocols control distribution, revision status and formal correspondence routes

Participants can plan completion, commissioning and handover activities with controlled close-out records.

  • Completion plans sequence snagging, testing, commissioning, training and document submission
  • Punch lists record location, defect description, responsible party and closure evidence
  • Testing schedules coordinate specialist attendance, prerequisites and witness requirements
  • Commissioning plans define systems, functional tests, records and acceptance criteria
  • As-built drawing controls capture approved changes during construction execution
  • Handover dossiers organise warranties, certificates, manuals and maintenance information

Participants can apply disciplined digital records and model-based information to site coordination.

  • Common data environment workflows control document issue, review and approval status
  • BIM coordination views identify clashes, access conflicts and construction sequence constraints
  • Mobile inspection forms capture photographs, location data and corrective actions
  • QR-coded material tracking links deliveries, certificates, locations and installation records
  • Dashboard data validation checks source records before management reporting
  • File naming conventions maintain traceable correspondence, drawings and quality evidence

Participants can lead structured site discussions that resolve operational issues and maintain accountability.

  • Daily huddles confirm priorities, hazards, resource gaps and work-front readiness
  • Situation-behaviour-impact feedback addresses performance issues with specific observed evidence
  • Root cause analysis uses five whys and fishbone diagrams
  • Escalation conversations distinguish technical decisions, commercial exposure and safety stop-work authority
  • Conflict resolution addresses trade interference, access disputes and sequence disagreements
  • Decision logs record options, approvals, assumptions and implementation responsibilities

Participants can build, review and present a complete Site Management Plan for a defined construction project.

  • Project execution brief defines scope, milestones, constraints, stakeholders and success measures
  • Site logistics plan integrates access, welfare, storage, traffic and emergency arrangements
  • Baseline and six-week schedules connect work packages, logic and constraints
  • Resource plan assigns crews, plant, materials and subcontractor responsibilities
  • Quality, safety and environmental controls align inspections, permits and risk assessments
  • Progress dashboard reports quantities, earned value, risks, actions and recovery measures
  • Peer review tests plan completeness, evidence quality, feasibility and decision readiness
  • Formal presentation defends priorities, control methods and response to project disruptions

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Site Management Plan template
  2. Six-week look-ahead planning pack
  3. Site logistics plan checklist
  4. Inspection and Test Plan template
  5. Daily site report and progress dashboard
  6. Change and delay evidence register

Who should attend

  • Site Engineers — need structured methods for controlling daily construction activities
  • Assistant Construction Managers — coordinate work fronts, trades and short-term delivery commitments
  • Project Engineers — translate design, programme and technical requirements into site actions
  • Construction Supervisors — improve planning, records, quality checks and workforce coordination
  • Section Engineers — manage defined work packages from mobilisation through handover
  • Graduate Civil Engineers — prepare for operational responsibility on building or infrastructure sites

Skills and tools covered

Site production planningShort-term schedulingSubcontractor coordinationQuality control recordsConstruction safety supervisionProgress reporting

Tools and standards

Critical Path Method, Earned Value Management, ISO 9001, FIDIC Conditions of Contract

How the course runs

Training methodology

The instructor uses short technical briefings followed by construction cases, document reviews, planning workshops and facilitated group discussions. Participants work with drawings, specifications, programme extracts, inspection records, risk assessments and progress data from realistic projects. Simulations test responses to delayed materials, trade interference, design revisions and unsafe conditions. Each participant builds elements of a Site Management Plan throughout the course, receives peer and instructor review, and converts course outputs into actions for their own project.

Requirements and prerequisites

Participants should have basic familiarity with construction projects, common site activities and technical drawings, gained through engineering, supervision, quantity surveying or trade experience. They should be able to read simple plans, sections and specifications and understand the relationship between client, consultant, contractor and subcontractor. Prior exposure to a live construction site is strongly preferred. Participants do not need formal project management certification, advanced planning software skills, contract-law qualifications or prior responsibility for a full project. A calculator and laptop are useful for planning and reporting work.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

Participants should understand basic construction activities and be able to read simple drawings. Experience on a building, civil engineering or infrastructure site is preferred, but formal project management certification is not required.

Bring a laptop if possible, along with examples of non-confidential drawings, programmes or site reports from your project. Course cases and templates are supplied, so participants without project documents can still complete all planning work.

It is designed for site engineers, assistant construction managers, project engineers, section engineers and supervisors. It is particularly useful for people taking responsibility for coordinating multiple trades and controlling daily delivery.

Project management courses usually address project governance, business cases, procurement and portfolio controls. This course concentrates on site execution: work fronts, resources, inspections, permits, subcontractors, progress records and handover.

Participants create reusable formats for look-ahead plans, logistics plans, inspection controls, daily reporting and delay records. They can adapt these materials to an active work package or upcoming mobilisation after the course.

Each training day runs from 08:30 to 16:30 and provides about 6.5 contact hours. Early modules establish planning and site-control tools; later modules apply them to quality, safety, commercial records, recovery and the final Site Management Plan.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.