Project Planning, Scheduling and Cost Estimation Training Course

Duration 10 days 16 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Project Managers, Project Planners and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 16 Nov 2026 Course code SD-PM-096

Before you join: Participants should have basic experience working on projects, such as contributing to a plan, managing a workstream, tracking actions or preparing estimates.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Projects fail to meet commitments when scope is unclear, activities are poorly sequenced, resources are assumed rather than planned, or estimates lack a defensible basis. Project managers and technical leads need plans that connect deliverables, work packages, dependencies, durations, resources, costs, risks and reporting controls. A credible plan gives sponsors a basis for approval, helps delivery teams coordinate work, and provides an early-warning system when dates or budgets begin to move.

This course develops the practical planning and control skills required to create integrated project plans. Participants define scope, build a work breakdown structure, sequence activities using network logic, calculate critical paths and float, estimate durations and resources, and produce time-phased budgets. They apply bottom-up, analogous and parametric estimating, establish contingency from risk analysis, and use earned value management to forecast cost and schedule performance. The course also addresses change control, schedule recovery, reporting cycles and planning governance.

Instruction combines concise technical briefings with cases, group planning work, calculations, schedule analysis and structured reviews. Participants progressively develop planning artefacts throughout the course, then assemble them into a complete project planning pack during the capstone. They leave with reusable templates for scope definition, WBS development, scheduling, estimating, budgeting, risk-based contingency and performance reporting, plus a certificate of completion.

The course suits project managers, planners, engineers, operations professionals, programme staff and cost-focused specialists responsible for preparing, reviewing or controlling project plans.

What you will be able to do

  • Define project scope, acceptance criteria, assumptions and control boundaries
  • Build a deliverable-based work breakdown structure and work package dictionary
  • Develop network schedules using precedence relationships, critical path analysis and float
  • Estimate activity durations using three-point estimates, productivity rates and resource calendars
  • Prepare bottom-up, analogous and parametric project cost estimates
  • Create time-phased cost baselines, contingency reserves and funding forecasts
  • Apply earned value management to calculate variances and forecast final costs
  • Present an integrated project planning pack with governance and control measures

Benefits of attending

For you

  • Produce schedules that show critical paths, float and realistic completion dates
  • Defend cost estimates with documented assumptions, quantities, rates and exclusions
  • Identify schedule and budget pressure before commitments are missed
  • Communicate planning trade-offs clearly to sponsors, suppliers and delivery teams
  • Build reusable planning documents for future project assignments

For your organisation

  • Improves approval decisions through traceable scope, schedule and cost baselines
  • Reduces omitted work and duplicate budgets through structured WBS development
  • Strengthens cost forecasts using risk-based contingency and earned value measures
  • Provides earlier warning of resource conflicts, slippage and potential overruns
  • Creates more consistent project reporting, change control and management escalation

Course modules

16 modules over 10 days

Participants can define project boundaries, success criteria and stakeholder decision requirements.

  • Project charter components: business case, objectives, authority, assumptions and constraints
  • Success criteria translated into measurable acceptance and performance targets
  • Stakeholder register identifies decision rights, influence, needs and communication expectations
  • Scope statement distinguishes product scope, project scope, exclusions and boundaries
  • Requirements traceability matrix links needs, deliverables, acceptance criteria and owners
  • Change control thresholds separate clarification, correction and authorised scope change

Participants can decompose approved scope into controllable work packages and control accounts.

  • Work breakdown structure decomposes approved scope into controllable work packages
  • 100 percent rule tests completeness without double counting deliverables
  • Deliverable-based decomposition separates outputs from activities and administrative effort
  • Work package dictionary records boundaries, owners, assumptions, resources and acceptance
  • Control accounts group work packages for responsibility and performance measurement
  • Rolling-wave planning details near-term work while preserving future planning packages

Participants can convert work packages into sequenced activities with explicit dependencies.

  • Activity lists convert work packages into schedulable tasks with clear completion points
  • Activity attributes capture predecessors, responsible roles, calendars and constraints
  • Milestone definition distinguishes zero-duration decision points from delivery activities
  • Dependency mapping identifies finish-to-start, start-to-start, finish-to-finish and start-to-finish relationships
  • Mandatory, discretionary and external dependencies documented with dependency rationale
  • Lead and lag values model overlap, waiting time and operational handoffs

Participants can construct network schedules and identify critical path activities and float.

  • Precedence diagramming method sequences activities using explicit logical relationships
  • Network diagrams expose parallel paths, merges, loops and missing predecessors
  • Critical path method calculates early dates, late dates and total float
  • Free float distinguishes local flexibility from project completion flexibility
  • Negative float signals imposed dates requiring scope, logic or resource action
  • Schedule constraints tested for realism before baseline approval

Participants can estimate activity durations using uncertainty, productivity and availability data.

  • Three-point estimating applies optimistic, most likely and pessimistic duration estimates
  • PERT weighted averages convert uncertainty into planning duration estimates
  • Expert judgment calibrated through reference-class comparisons and documented assumptions
  • Resource calendars reflect working time, shifts, holidays and availability restrictions
  • Productivity rates convert quantities, crew sizes and outputs into durations
  • Duration contingency protects uncertain activities without concealing management reserve

Participants can assign resources, identify conflicts and improve schedule feasibility.

  • Resource loading assigns labour, equipment and materials to scheduled activities
  • Resource histograms reveal peaks, gaps and competing assignment demands
  • Resource levelling resolves overallocations by changing dates, logic or assignments
  • Resource smoothing protects fixed completion dates while using available float
  • Critical chain buffers protect resource-constrained schedules from variability
  • Responsibility assignment matrices align work packages, accountable owners and support roles

Participants can establish schedule baselines and communicate key delivery commitments.

  • Schedule baseline records approved dates, logic, calendars and milestone commitments
  • Baseline review checks scope coverage, feasible durations and resource availability
  • Milestone schedules communicate executive commitments without hiding detailed control logic
  • Near-critical path analysis identifies activities requiring active management attention
  • Schedule narrative explains assumptions, constraints, key risks and update rules
  • Change requests assess time effects before altering approved baseline dates

Participants can select and document appropriate cost estimating methods for project maturity.

  • Estimate basis documents scope, quantities, rates, exclusions and source data
  • Analogous estimating derives early costs from comparable completed projects
  • Parametric estimating applies unit rates, cost drivers and scaling factors
  • Bottom-up estimates aggregate work package labour, materials, equipment and services
  • Vendor quotations evaluated for specification alignment, validity periods and commercial conditions
  • Estimating accuracy ranges matched to project definition maturity

Participants can develop transparent work package cost estimates from cost components.

  • Cost breakdown structure aligns estimates with work packages and control accounts
  • Direct labour costs calculated from hours, rates, burdens and productivity
  • Material estimates include quantities, wastage, freight, duties and price basis
  • Equipment costs separate ownership, hire, mobilisation, operating and demobilisation charges
  • Indirect costs allocated using stated bases and traceable calculation rules
  • Estimate reconciliation identifies omissions, overlaps, arithmetic errors and unsupported allowances

Participants can quantify uncertainty and establish justified contingency reserves.

  • Risk register links identified threats and opportunities to cost and schedule exposure
  • Expected monetary value quantifies discrete risks using probability and impact
  • Contingency reserves derived from risk analysis rather than percentage habit
  • Management reserve distinguished from cost baseline and assigned risk ownership
  • Sensitivity analysis identifies assumptions with the greatest estimate influence
  • Monte Carlo simulation interprets confidence ranges for dates and costs

Participants can create time-phased budgets and approved project cost baselines.

  • Time-phased budgets distribute work package costs across planned execution periods
  • Cost baseline integrates authorised scope, schedule dates and resource requirements
  • Funding requirements distinguish planned expenditure from cash availability and release timing
  • S-curves display cumulative planned value, actual cost and forecast expenditure
  • Control accounts establish budget holders, reporting boundaries and variance responsibility
  • Budget change control preserves version history, approvals and audit trail

Participants can measure performance and forecast final project cost and schedule outcomes.

  • Earned value management integrates scope, schedule and cost performance measures
  • Planned value, earned value and actual cost calculated consistently
  • Schedule performance index and cost performance index diagnose execution trends
  • Estimate at completion uses CPI, SPI and management forecasting judgment
  • Variance at completion quantifies expected overrun or underrun against budget
  • Performance reports distinguish current-period variance from cumulative variance

Participants can collect reliable progress data and test schedule quality.

  • Status date discipline prevents mixing completed work with future reporting periods
  • Physical percent complete uses objective completion rules for earned value
  • Remaining duration updates test forecast dates against current productivity
  • Progress measurement methods suit discrete, apportioned and level-of-effort work
  • Schedule health checks test logic quality, excessive constraints and long activities
  • Cost forecasts reconcile commitments, actuals, accruals and remaining work

Participants can assess change impacts and prepare targeted recovery plans.

  • Integrated change control evaluates scope, schedule, cost, risk and benefit effects
  • Impact assessments trace requested changes through work packages and milestones
  • Schedule compression compares crashing costs with fast-tracking risk exposure
  • Recovery plans prioritise critical path actions, resource shifts and decisions
  • Trend registers distinguish emerging pressure from approved baseline changes
  • Decision logs record alternatives, authority, rationale and implementation dates

Participants can establish planning governance, escalation thresholds and useful management reports.

  • Weekly control cycle collects status, validates evidence, forecasts outcomes and escalates decisions
  • RAG thresholds trigger predefined management action before tolerance breaches
  • Milestone trend analysis reveals forecast slippage across successive reporting periods
  • Dashboard design separates executive indicators from workstream control detail
  • Variance narratives state cause, effect, corrective action, owner and due date
  • Project closeout captures estimating assumptions, actual rates and schedule lessons

Participants can build, review and present a complete integrated project planning pack.

  • Integrated planning pack combines scope, schedule, resources, estimate and risk provisions
  • Charter, scope statement and WBS form the approved planning foundation
  • Network schedule identifies critical path, float, constraints and key milestones
  • Cost baseline time-phases control-account budgets and contingency provisions
  • Earned value measures define progress rules, thresholds and forecast calculations
  • Governance pack specifies status cycle, change authority and escalation routes
  • Peer review tests traceability, feasibility, assumptions and management presentation
  • Management presentation defends plan choices, forecast logic and control actions

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Project charter and scope statement template
  2. Work breakdown structure and dictionary template
  3. Critical path schedule model
  4. Cost estimate basis and build-up worksheet
  5. Time-phased cost baseline model
  6. Earned value reporting and forecast dashboard

Who should attend

  • Project Managers — need defensible plans, baselines and control routines
  • Project Planners — need stronger scheduling, resource loading and forecasting methods
  • Engineers and Technical Leads — need to convert technical scope into executable work packages
  • Programme Officers — need consistent planning and reporting across funded projects
  • Cost Engineers and Quantity Surveyors — need integrated estimate, budget and schedule controls
  • Operations Managers — need to assess project plans before committing people and assets

Skills and tools covered

Scope decompositionCritical path schedulingResource planningCost estimationBudget controlEarned value analysis

Tools and standards

Work Breakdown Structure, Critical Path Method, Earned Value Management, ISO 21502

How the course runs

Training methodology

The course uses short instructor briefings to introduce methods, followed by case analysis, group planning tasks, calculations, schedule reviews and decision simulations. Participants apply each method to a continuing project case, beginning with scope and progressing through scheduling, estimating, budgeting and performance control. Facilitated reviews compare alternative assumptions, dependency logic and estimate bases. Individual application planning helps participants identify documents, data sources and governance practices to use on current or upcoming projects.

Requirements and prerequisites

Participants should have basic experience working on projects, such as contributing to a plan, managing a workstream, tracking actions or preparing estimates. They should be comfortable with simple arithmetic, percentages and spreadsheet calculations. Familiarity with project terminology such as milestones, stakeholders, risks and budgets is useful. Prior use of scheduling software, earned value management or formal estimating systems is not required. The course does not assume prior certification in project management or advanced finance, engineering or statistical knowledge.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

You should have some exposure to project work, workstreams, budgets, schedules or delivery reporting. Formal project management certification, scheduling software experience and advanced finance knowledge are not required.

Bring a laptop with spreadsheet software if possible, plus details of a current or recent project you can use for application planning. Participants may also bring existing schedules, estimates or reporting formats, subject to their organisation's confidentiality rules.

It is designed for project managers, planners, technical leads, programme officers, cost specialists and operations managers. It is particularly useful for people who need to prepare or challenge project plans before approval.

General project management courses cover the full project lifecycle and broad management responsibilities. This course concentrates on the technical disciplines of scope decomposition, scheduling, resource planning, estimating, budgeting and performance control.

You will be able to use the templates and models to structure a new project plan, review supplier schedules, test estimate assumptions and improve reporting on active work. The capstone planning pack provides a practical reference for adapting the methods to your organisation.

Each training day runs from 08:30 to 16:30 and provides about 6.5 contact hours. The first part of the course builds scope, WBS, scheduling and estimating foundations; the second part develops budgeting, earned value, change control, reporting and the final capstone.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.