Construction Estimating and Bidding Training Course

Duration 10 days 20 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Construction Estimators, Quantity Surveyors and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 16 Nov 2026 Course code SD-CM-124

Before you join: Participants should understand basic construction terminology, common trade packages, drawings and specifications, and the sequence of a typical building or civil works project.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Construction contractors win work or lose margin long before site mobilisation. An estimate must translate drawings, specifications, quantities, productivity, procurement conditions and project risk into a defensible price. Bidders also need to identify scope gaps, obtain reliable supplier quotations, allow for preliminaries and escalation, and submit a compliant tender before the deadline. Weak estimating control can produce bids that appear competitive but contain omissions, unsupported allowances or contractual exposures.

This course develops the pre-construction estimating and bidding skills needed to prepare, review and defend a construction tender. Participants work through the estimate build-up from bid/no-bid screening and document control to quantity take-off, cost coding, labour productivity, plant, materials, subcontract packages, indirect costs, contingencies and mark-ups. The programme addresses tender strategy, supplier enquiries, bid comparisons, commercial qualifications, construction planning, cash-flow implications, bid review meetings and post-tender handover.

Instruction combines short technical briefings with worked estimates, drawing and specification reviews, group bid analysis, supplier quotation comparisons and tender-review simulations. Participants progressively assemble a bid file during the course, using structured templates that can be adapted to their own organisation's estimating procedures. They leave with a complete tender estimate, bid review pack, risk register, scope matrix and submission checklist suitable for use on building, civil engineering or infrastructure projects.

The course suits estimators, quantity surveyors, project engineers, bid managers and construction professionals moving into pre-construction responsibilities. It is especially relevant where teams price competitive tenders, negotiate subcontract packages or need stronger governance before committing a bid price.

What you will be able to do

  • Assess bid opportunities using structured bid/no-bid criteria and procurement intelligence
  • Interpret drawings, specifications, addenda and contractual documents for estimating requirements
  • Prepare quantity take-offs and work breakdown structures using recognised measurement principles
  • Build direct-cost estimates for labour, materials, plant and subcontract packages
  • Calculate preliminaries, overheads, contingencies, escalation allowances and tender mark-ups
  • Evaluate supplier and subcontractor quotations through scope, price and commercial comparisons
  • Produce compliant tender submissions with qualifications, clarifications and bid-review evidence
  • Present and defend a complete construction estimate and tender recommendation

Benefits of attending

For you

  • Prepare traceable estimates rather than relying on broad percentage allowances
  • Identify drawing, specification and interface gaps before tender submission
  • Challenge supplier quotations using structured commercial and scope comparisons
  • Contribute credible evidence during bid review and approval meetings
  • Build a portfolio-quality tender estimate for future estimating roles

For your organisation

  • Reduce tender omissions through disciplined document, scope and addenda controls
  • Improve bid margins through better productivity, preliminaries and risk allowances
  • Strengthen approval governance with auditable estimate and bid-review records
  • Increase supplier quotation comparability through consistent enquiry and comparison formats
  • Improve project handover by transferring priced assumptions and exclusions clearly

Course modules

20 modules over 10 days

Participants can map the estimating and bidding process from opportunity identification through project handover.

  • Contractor pre-construction functions from opportunity screening through project award
  • Tender lifecycle milestones, decision gates, responsibilities and submission deadlines
  • Estimator, bid manager, quantity surveyor and project manager accountabilities
  • Competitive, negotiated, two-stage and framework procurement route differences
  • Bid information flow between client, designers, suppliers and subcontractors
  • Estimate basis document as the central record of pricing assumptions

Participants can make evidence-based bid/no-bid recommendations using commercial and delivery criteria.

  • Bid/no-bid scorecard covering capability, capacity, risk and strategic fit
  • Client payment record, reputation and decision-making intelligence sources
  • Assessing site constraints, programme demands and resource availability early
  • Competitor profiling without unsupported assumptions or informal price intelligence
  • Procurement timetable analysis for enquiry, pricing, review and submission
  • Documenting bid decision rationale for management approval and audit

Participants can establish a controlled tender document register and extract pricing requirements.

  • Tender document register covering drawings, specifications, schedules and addenda
  • Revision control procedures for issued-for-tender drawings and clarifications
  • Reading general conditions, special conditions and employer requirements
  • Cross-checking drawing notes against specification clauses and schedules
  • Request for information logs with ownership, due dates and status
  • Identifying conflicts, ambiguities and missing information affecting the estimate

Participants can define estimate scope through a coded work breakdown structure.

  • Work breakdown structure aligned with construction sequence and cost control
  • CSI MasterFormat divisions for organising trade packages and estimate codes
  • UniFormat II elements for early-stage building cost planning
  • Scope matrix separating included work, exclusions and client-supplied items
  • Interface mapping between civil, structural, architectural and MEP packages
  • Coding labour, material, plant and subcontract cost components consistently

Participants can prepare checked quantity take-offs from drawings and specifications.

  • Manual dimension sheets for lengths, areas, volumes and item counts
  • Taking off excavation quantities using sections, contours and formation levels
  • Concrete, reinforcement and formwork quantities from structural drawings
  • Wall, floor, ceiling and finishes take-offs from architectural plans
  • Measurement checklists preventing duplicated quantities and unmeasured scope
  • Independent take-off checks using reasonableness ratios and drawing reconciliation

Participants can organise measured work into clear and auditable pricing items.

  • Bills of quantities, schedules of rates and lump-sum price structures
  • Unit descriptions defining location, material, workmanship and measurement basis
  • Provisional sums, prime cost sums and daywork treatment
  • Separating measured work from preliminaries, attendance and temporary works
  • Pricing alternates, options and client-requested value engineering items
  • Reconciliation between take-off sheets, bill items and estimate codes

Participants can build labour cost estimates using crew outputs and burdened rates.

  • Labour rate build-up including wages, payroll burdens and allowances
  • Crew composition matched to trade methods and planned outputs
  • Production rate calculations from quantity, crew hours and working time
  • Adjusting productivity for access, congestion, weather and learning effects
  • Overtime, shift work and premium-time cost implications
  • Benchmarking labour hours against completed projects and published norms

Participants can price material and plant resources with documented sourcing assumptions.

  • Material pricing from supplier quotations, catalogues and historical purchase data
  • Waste factors, cutting losses, laps and breakage allowances
  • Equipment ownership cost using depreciation, fuel, maintenance and operator inputs
  • Rental plant comparisons using minimum hire periods and mobilisation charges
  • Freight, storage, offloading and handling costs within material pricing
  • Recording quotation validity, lead times and currency assumptions

Participants can issue scoped subcontract enquiries and evaluate returned tenders.

  • Subcontract enquiry packages containing scope, drawings, terms and return dates
  • Bidder lists based on capability, workload, location and financial standing
  • Levelling subcontract quotations against a common scope matrix
  • Normalising exclusions, qualifications, provisional items and payment terms
  • Assessing subcontractor programme, resources and proposed construction methodology
  • Documenting recommendation rationale before subcontractor selection approval

Participants can convert proposed construction methods into measurable cost allowances.

  • Method statements as sources for labour, plant and temporary works
  • Site logistics planning for access, laydown, lifting and material movement
  • Temporary works allowances for excavation support, access and protection
  • Construction sequencing effects on crew continuity and equipment utilisation
  • Off-site fabrication decisions compared with site installation costs
  • Method-related assumptions recorded within the estimate basis document

Participants can calculate time-related and fixed preliminaries for a tender.

  • Preliminaries schedule covering management, welfare, security and site establishment
  • Time-related costs calculated from programme duration and staffing levels
  • Fixed-cost items including permits, insurances, surveys and mobilisation
  • Site office, utilities, communications and consumables cost allowances
  • Health, safety and environmental requirements priced from tender obligations
  • Allocating shared site resources across work packages without double counting

Participants can link a tender programme to resource, preliminary and cash requirements.

  • Critical path method logic linking activities, durations and completion milestones
  • Resource loading activities with labour, plant and subcontract requirements
  • Programme duration effects on preliminaries, escalation and working capital
  • Milestone constraints, sectional completion and liquidated damages exposure
  • Testing programme assumptions against site access and procurement lead times
  • Time-phased estimate summaries supporting cash-flow and management review

Participants can quantify tender risk and document appropriate contingency allowances.

  • Risk register linking cause, event, consequence, owner and response
  • Probability-impact scoring for prioritising estimate risks and opportunities
  • Expected monetary value calculations for identified cost risk events
  • Contingency allowances separated from scope omissions and management reserve
  • Price escalation analysis using procurement timing and market indicators
  • Risk workshops challenging assumptions before final tender price approval

Participants can identify contractual provisions that require pricing, qualification or escalation.

  • Payment terms, retention, advance payments and working-capital implications
  • Liquidated damages, delay obligations and completion milestone exposure
  • Variation procedures, notice requirements and valuation mechanisms
  • Price adjustment clauses, currency provisions and tax treatment
  • Bonds, guarantees and insurance requirements included within bid costs
  • Commercial qualifications drafted without contradicting tender instructions

Participants can consolidate detailed costs into a controlled estimate summary.

  • Direct-cost summary by work package, resource type and cost code
  • Checking arithmetic, units, rates and quantity extensions systematically
  • Estimate reconciliation against initial budget, benchmarks and prior tenders
  • Cost drivers analysis identifying high-value and high-risk estimate items
  • Overhead allocation and profit mark-up decisions within approval limits
  • Estimate basis narrative explaining methods, assumptions and commercial positions

Participants can obtain, compare and select supplier quotations for tender pricing.

  • Request for quotation documents defining quantities, specifications and delivery requirements
  • Supplier bid tabulations comparing rates, lead times and commercial terms
  • Apples-to-apples comparison adjustments for scope gaps and freight differences
  • Clarification records resolving inconsistent technical and commercial responses
  • Fallback pricing methods when compliant quotations are unavailable
  • Supplier selection recommendations supported by price, risk and capacity evidence

Participants can recommend a bid strategy aligned with client priorities and market conditions.

  • Client evaluation criteria translated into pricing, programme and proposal priorities
  • Target price positioning informed by cost base and market intelligence
  • Value engineering proposals with quantified savings and delivery implications
  • Bid differentiators supported by evidence, not unsupported marketing claims
  • Pricing sensitivity analysis for major quantities, rates and risk allowances
  • Management approval thresholds for margin, contingency and commercial departures

Participants can prepare a compliant submission and lead a structured bid review.

  • Tender compliance checklist covering forms, signatures, bonds and attachments
  • Submission schedules coordinating technical, commercial and administrative deliverables
  • Bid review agenda covering scope, risks, price and approval actions
  • Red-team review techniques testing omissions, arithmetic and contractual exposures
  • Clarification and qualification registers controlled before tender submission
  • Final submission verification against client instructions and portal requirements

Participants can manage post-tender engagement and transfer priced assumptions to delivery teams.

  • Post-tender clarification responses preserving approved pricing and qualifications
  • Best-and-final offer decisions supported by revised risk assessment
  • Tender interview preparation using estimate evidence and construction methodology
  • Bid-to-project handover checklist for scope, allowances and procurement commitments
  • Estimate handover meeting between bid team, project team and commercial staff
  • Capturing tender outcomes for estimating database and lessons learned

Participants can build, review and present a complete construction tender estimate and bid recommendation.

  • Compile controlled quantities, resource rates, quotations and preliminaries into one estimate
  • Prepare estimate basis, scope matrix, exclusions and clarification register
  • Quantify risk allowances, escalation exposure and proposed tender mark-up
  • Conduct bid review using compliance, cost, risk and programme evidence
  • Present tender recommendation, commercial qualifications and approval requirements clearly
  • Defend pricing assumptions against structured management and client questions

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Estimate basis document template
  2. Quantity take-off workbook
  3. Subcontract bid comparison matrix
  4. Tender risk and contingency register
  5. Bid review approval checklist
  6. Complete tender estimate pack

Who should attend

  • Construction Estimators — improve estimate accuracy, traceability and bid confidence
  • Quantity Surveyors — connect measurement, pricing and tender commercial decisions
  • Bid Managers — coordinate compliant submissions and disciplined bid governance
  • Project Engineers — translate construction methods and productivity into priced work
  • Project Managers — review bid assumptions before accepting delivery commitments
  • Procurement Specialists — assess supplier quotations and subcontract tender packages

Skills and tools covered

Quantity take-offCost build-upTender strategyBid risk analysisSubcontract procurementEstimate review

Tools and standards

CSI MasterFormat, UniFormat II, Critical Path Method, Expected Monetary Value

How the course runs

Training methodology

The course uses short instructor briefings followed by worked examples, drawing reviews, estimating calculations and team-based bid decisions. Participants analyse tender documents, build quantity and cost information, compare supplier quotations, test risk allowances and conduct bid-review discussions. Case material reflects contractor bidding for building, civil works and infrastructure packages. Facilitated simulations address tender deadlines, clarification management and management approval. Individual application planning helps participants adapt the estimate structure, review controls and submission documents to their own tender process.

Requirements and prerequisites

Participants should understand basic construction terminology, common trade packages, drawings and specifications, and the sequence of a typical building or civil works project. Experience in site engineering, quantity surveying, procurement, project controls or contractor operations is useful. Participants should be comfortable working with percentages, units of measure, simple spreadsheet calculations and project documents. Prior estimating experience is not required, although the course moves beyond introductory concepts quickly. Formal quantity surveying qualifications, advanced spreadsheet modelling skills, BIM authoring capability and knowledge of any specific national contract form are not required.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

Participants need basic familiarity with construction projects, drawings, specifications and trade terminology. Previous estimating experience is useful but not essential; formal quantity surveying qualifications are not required.

Participants should bring a laptop with spreadsheet software if possible, along with a calculator. They may also bring non-confidential drawings, estimate formats or tender checklists from their organisation for application planning.

It is designed for estimators, quantity surveyors, bid managers, project engineers, procurement specialists and project managers involved in contractor tendering. It also suits construction professionals moving from site delivery into pre-construction roles.

Quantity surveying courses often concentrate on measurement, valuation and contract administration, while project management courses focus on delivery control. This programme concentrates on assembling a contractor's priced tender, selecting bid assumptions and obtaining approval before contract award.

Participants can adapt the estimate basis, scope matrix, supplier comparison, risk register and bid-review checklist for live opportunities. The methods help teams make pricing assumptions visible before submitting a tender.

The first week establishes document control, scope definition, take-off and direct-cost build-up. The second week covers preliminaries, programme, risk, commercial terms, tender strategy, submission controls and a complete estimate capstone.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.