Construction Planning with Primavera P6 Training Course

Duration 10 days 20 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Planning Engineers, Project Managers and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 16 Nov 2026 Course code SD-CM-134

Before you join: Participants should understand basic construction project stages, common site activities and the purpose of a project schedule.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Construction projects depend on plans that can withstand changing site conditions, design releases, procurement constraints, subcontractor interfaces and client reporting requirements. A Primavera P6 schedule is more than a bar chart: it is a controlled model of scope, sequence, resources, contractual milestones and forecast dates. Poorly structured schedules create unreliable progress reports, conceal critical path movement and make delay analysis difficult when disputes arise.

This course develops the planning and management skills required to build, maintain and report construction programmes in Oracle Primavera P6 Professional. Participants create work breakdown structures, activity networks, calendars, logic links, constraints, resource assignments, cost-loaded schedules and approved baselines. They apply critical path method scheduling, resource and cost analysis, progress updating, earned value management and schedule quality checks. The course also addresses look-ahead planning, schedule recovery, delay records and reporting for project managers, clients and site teams.

Teaching combines focused instructor briefings with guided Primavera P6 system work, construction cases, schedule review discussions, group planning tasks and reporting simulations. Participants build a progressively detailed construction programme from the first week, then update, analyse and defend it during the second week. They leave with a reusable project planning pack containing a logic-linked baseline programme, coding structure, resource and cost plan, update procedure, dashboard reports and recovery recommendations.

The course suits professionals responsible for preparing, reviewing or using construction schedules on building, infrastructure, industrial, utilities and engineering projects. It is particularly useful where teams must produce client-ready programmes, coordinate multiple contractors or demonstrate schedule performance against contractual milestones.

What you will be able to do

  • Build a logic-linked Primavera P6 construction programme from a defined scope and work breakdown structure
  • Create activity networks using critical path method relationships, calendars, lags and constraints
  • Assign labour, plant, materials and costs to produce resource-loaded and cost-loaded schedules
  • Establish approved baselines and control schedule changes through documented update procedures
  • Update construction programmes using status dates, actual progress, remaining durations and forecast logic
  • Analyse critical paths, float, resource conflicts and schedule risk indicators using Primavera P6
  • Produce progress reports, look-ahead plans and earned value metrics for project stakeholders
  • Present a complete construction planning pack with recovery actions and management recommendations

Benefits of attending

For you

  • Produce client-ready Primavera P6 programmes without relying on specialist schedulers
  • Diagnose critical path movement before missed milestones become visible
  • Prepare defensible baseline and progress records for delay and extension discussions
  • Convert site progress information into reliable forecast completion dates
  • Contribute effectively to planning meetings with contractors, consultants and clients

For your organisation

  • Improves consistency of programme structure across projects and contractor submissions
  • Provides earlier warning of milestone slippage, interface failures and resource bottlenecks
  • Strengthens evidence for extensions of time, recovery planning and contractual reporting
  • Links site progress, resource demand and forecast costs within one planning model
  • Reduces reliance on unsupported percentage-complete reporting and static bar charts

Course modules

20 modules over 10 days

Participants can configure a Primavera P6 workspace and explain how a controlled construction programme supports project decisions.

  • Project planning functions within contractor, consultant and client control environments
  • Oracle Primavera P6 Professional interface, databases, layouts and user preferences
  • Enterprise project structure and organisational breakdown structure relationships explained
  • Project codes, activity codes and user-defined fields for reporting
  • Planning assumptions, constraints and contractual milestones documented before programme development
  • Data date, planned dates, actual dates and forecast dates distinguished

Participants can translate construction scope into a coded work breakdown structure suitable for scheduling and reporting.

  • Work breakdown structure aligned with contract packages and deliverables
  • Coding structures for location, discipline, contractor and construction phase
  • Control accounts connecting scope packages with responsibility and reporting
  • Bill of quantities and drawing registers used for scope verification
  • Defining measurable work packages before creating detailed programme activities
  • WBS dictionaries recording scope boundaries, assumptions and ownership

Participants can develop measurable activities that represent realistic construction methods and trade handovers.

  • Activity naming conventions identifying location, trade, workfront and deliverable
  • Construction sequencing from mobilisation through testing, commissioning and handover
  • Breaking work packages into measurable activities with clear completion criteria
  • Procurement, fabrication, delivery and installation activities integrated into programmes
  • Trade interfaces mapped between civil, structural, mechanical and electrical works
  • Milestones defined for approvals, access, sectional completion and possession

Participants can apply calendars and duration assumptions that reflect site working arrangements and productivity.

  • Global, project and resource calendars configured for construction working patterns
  • Weather allowances, holidays and shift arrangements incorporated into calendars
  • Production rates converted into activity durations using quantity take-offs
  • Crew sizes, plant outputs and access restrictions tested against durations
  • Long-lead procurement durations separated from manufacturing and delivery periods
  • Duration assumptions recorded in a schedule basis memorandum

Participants can create logic-linked networks and identify the critical path through a construction programme.

  • Finish-to-start, start-to-start, finish-to-finish and start-to-finish relationships applied
  • Lead and lag usage tested against physical construction sequence
  • Critical path method forward pass and backward pass principles
  • Open ends, redundant logic and circular relationships identified
  • Driving relationships reviewed using Primavera P6 trace logic tools
  • Logic narratives explaining key sequence assumptions and interface dependencies

Participants can manage constraints and milestones without distorting forecast logic or critical path results.

  • Mandatory start and mandatory finish constraints assessed for schedule distortion
  • Start-on and finish-on constraints applied only where contractually necessary
  • Project milestones linked to notice-to-proceed, approvals and completion obligations
  • Contract data dates and completion dates reconciled with baseline requirements
  • Constraint logs recording source, owner, rationale and removal actions
  • Negative float investigated through logic, durations and contractual dates

Participants can produce an initial logic-linked Primavera P6 programme from a defined construction scope.

  • Creating projects, WBS elements, activities and calendars in Primavera P6
  • Importing activity data from structured spreadsheet planning registers
  • Assigning predecessors, successors, lags and milestone relationships efficiently
  • Grouping and sorting layouts by WBS, location and responsible party
  • Gantt chart formatting for construction sequence and milestone communication
  • Schedule calculation settings checked before reviewing early and late dates

Participants can assess schedule quality using defined checks and communicate corrective actions to programme authors.

  • DCMA 14-point assessment principles applied to construction programme quality
  • Missing logic, excessive lags and high-duration activities flagged
  • Critical path continuity checked from data date to completion
  • Float values reviewed for constraints, outliers and misleading paths
  • Schedule health reports converted into corrective action registers
  • Independent programme review comments structured for formal submissions

Participants can resource-load activities and analyse labour, plant and material demand across the programme.

  • Resource dictionaries structured for labour, plant, material and subcontract packages
  • Labour crews assigned using production rates and planned quantities
  • Plant resources matched to excavation, lifting and concrete operations
  • Material delivery requirements linked to installation activity demand
  • Resource calendars reflecting shifts, availability and planned shutdowns
  • Histograms analysed for peaks, gaps and unrealistic mobilisation profiles

Participants can evaluate resource conflicts and develop workable options for resource-constrained construction programmes.

  • Resource levelling options compared against contractual completion dates
  • Priority rules for critical activities, scarce plant and specialist crews
  • Workfront release dates coordinated with access and predecessor completion
  • Crew continuity assessed using resource profiles and activity sequence
  • Subcontractor interfaces reviewed through shared area and handover milestones
  • Levelling decisions documented with resulting critical path consequences

Participants can create cost-loaded schedules and derive time-phased budget information for project controls.

  • Cost accounts mapped to WBS elements and activity assignments
  • Labour, plant, material and subcontract costs assigned to activities
  • Planned value curves generated from cost-loaded programme data
  • Time-phased budgets reconciled with approved cost plan categories
  • Cash flow forecasts derived from planned expenditure profiles
  • Cost loading assumptions recorded for audit and change control

Participants can establish, maintain and compare schedule baselines under formal project change control.

  • Baseline schedule approval requirements defined within project controls procedures
  • Original, current and supplementary baselines distinguished for reporting
  • Baseline copies created and assigned within Primavera P6 projects
  • Change requests assessed for scope, sequence, duration and resource effects
  • Schedule basis memorandum updated after approved programme changes
  • Baseline comparison layouts highlighting variance against planned dates

Participants can update construction schedules using consistent progress rules and current site information.

  • Status date selection aligned with reporting cut-off and site records
  • Actual starts, actual finishes and remaining durations entered correctly
  • Physical percent complete, duration percent complete and units percent complete compared
  • Rules of credit defined for measurable construction activity progress
  • Progress evidence drawn from inspections, quantities, timesheets and delivery records
  • Out-of-sequence progress assessed using retained logic and progress override

Participants can explain forecast movement and identify the causes of schedule variance after each update.

  • Current critical path compared with approved baseline critical path
  • Total float movement analysed by activity, path and contractual milestone
  • Variance tables identify delayed starts, finishes and remaining work
  • Remaining duration forecasts tested against productivity and resource availability
  • Near-critical paths monitored through float thresholds and look-ahead reviews
  • Forecast narratives distinguish completed events from anticipated future risks

Participants can calculate and interpret earned value indicators from integrated schedule and cost data.

  • Planned value, earned value and actual cost definitions established
  • Budgeted cost of work scheduled derived from time-phased baselines
  • Budgeted cost of work performed calculated from approved progress rules
  • Schedule performance index and cost performance index interpreted
  • Estimate at completion forecasts compared using standard earned value formulas
  • Earned value limitations recognised for subcontract and quantity-based work

Participants can produce practical look-ahead plans that connect the master programme to site execution.

  • Three-week and six-week look-ahead schedules filtered from Primavera P6
  • Constraint removal logs assigned to design, procurement and site owners
  • Last Planner System principles applied to weekly work planning
  • Ready-for-work criteria checked before releasing activities to site teams
  • Daily production records compared with planned quantities and crew outputs
  • Look-ahead meetings structured around workfronts, constraints and commitments

Participants can identify delay effects and develop schedule recovery options supported by programme evidence.

  • Delay event registers linked to affected activities, evidence and notices
  • Time impact analysis principles applied to prospective delay events
  • Windows analysis principles used for retrospective programme assessment
  • Concurrency assessed through critical path status and overlapping delay periods
  • Recovery options compare resequencing, additional resources, overtime and shiftwork
  • Mitigation actions tested for cost, safety, quality and access impacts

Participants can produce clear programme reports for project teams, senior managers, clients and contractors.

  • Executive dashboards report milestones, critical issues, trends and decisions
  • Narrative reports explain progress, variance, risks and recovery actions
  • Layouts tailored for client, site team, subcontractor and management audiences
  • S-curves display planned, earned and actual performance information
  • Milestone charts distinguish contractual obligations from internal control dates
  • Report quality checks confirm dates, status, assumptions and data sources

Participants can administer programme data using controlled coding, versioning and schedule governance practices.

  • Project calendars, codes and dictionaries governed through controlled standards
  • Schedule update cycles define responsibilities, cut-off dates and approvals
  • Version control procedures preserve submitted programmes and change records
  • XER exports, imports and data checks managed without corrupting schedules
  • Security roles restrict unauthorised changes to baselines and project data
  • Planning assurance audits test compliance with programme management procedures

Participants can build, review and present a complete Primavera P6 construction planning pack with justified management actions.

  • Project scope converted into coded WBS, activities and milestone structure
  • Logic-linked programme developed with calendars, durations and construction interfaces
  • Resources and costs assigned to produce time-phased demand profiles
  • Baseline, progress update and variance analysis prepared from supplied records
  • Critical delays assessed with recovery actions and responsibility assignments
  • Management dashboard and programme narrative prepared for stakeholder review

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Primavera P6 construction programme template
  2. Schedule basis memorandum template
  3. Programme quality assurance checklist
  4. Resource-loaded planning model
  5. Progress update and reporting pack
  6. Delay and recovery action register

Who should attend

  • Planning Engineers — build, update and analyse construction programmes
  • Project Managers — control milestones, interfaces and delivery forecasts
  • Construction Managers — translate site production requirements into workable schedules
  • Project Controls Engineers — integrate schedule, cost, resources and progress data
  • Quantity Surveyors — interpret cost-loaded programmes and time-related cost impacts
  • Contract Administrators — assess programme submissions, extensions of time and delay records

Skills and tools covered

Primavera P6 schedulingCritical path analysisResource loadingBaseline controlProgress measurementSchedule reporting

Tools and standards

Oracle Primavera P6 Professional, Critical Path Method, DCMA 14-Point Assessment, Earned Value Management

How the course runs

Training methodology

Instruction alternates short technical briefings with guided work in Oracle Primavera P6 Professional. Construction cases supply scope, drawings, milestones, procurement data, resources and progress records for programme development. Participants test logic, calendars, constraints, resource assignments and update methods in small groups, then review outputs against client and contractor reporting needs. Simulations address late design information, delayed procurement, productivity shortfalls and recovery choices. Individual application planning connects the methods to participants' own project controls responsibilities.

Requirements and prerequisites

Participants should understand basic construction project stages, common site activities and the purpose of a project schedule. Experience reading Gantt charts, construction drawings, bills of quantities or contractor programmes is useful. The course assumes confidence using a Windows-based computer, including files, folders and spreadsheets. No previous Primavera P6 experience is required, and participants do not need advanced mathematics, coding skills or formal project management certification. Those new to construction should first gain familiarity with construction sequencing, trade interfaces and typical project documentation.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

You should understand basic construction activities and be comfortable using a computer. Previous Primavera P6 experience is not required, but experience reading a Gantt chart or contractor programme will help.

Bring a laptop if your course joining instructions request one, together with a current project programme or planning challenge where confidentiality permits. Course materials and Primavera P6 case data are provided.

It is designed for planning engineers, project managers, construction managers, project controls staff, quantity surveyors and contract administrators. It also suits technical professionals moving into planning responsibilities.

This course concentrates on construction programme development and control in Oracle Primavera P6 Professional. It addresses activity logic, trade interfaces, resource loading, baselines, progress updates, delay evidence and construction reporting rather than general leadership or project governance topics.

Participants can use the templates and methods to review an existing programme, improve coding and logic, establish a baseline procedure or strengthen weekly progress reporting. The planning pack is designed for adaptation to live building, infrastructure and engineering projects.

The first week builds the programme model from scope, WBS, activities, logic, calendars, resources and costs. The second week focuses on baselines, updates, variance analysis, earned value, look-aheads, delay, reporting and the final integrated capstone.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.