Course overview
Construction programmes fail when scope, sequencing, production rates, resources, procurement dates and contractual milestones are not translated into a controlled schedule. Project teams may hold a Primavera P6 file, yet still lack reliable logic, realistic durations, defensible updates or clear reports for clients and site managers. The result is late warning of delay, poorly coordinated work fronts, disputed progress and weak evidence when time claims arise.
This course develops the practical planning and scheduling skills required to build, maintain and communicate construction programmes in Primavera P6 Professional. Participants structure projects using work breakdown structures, activity codes, calendars and coding dictionaries; develop critical path method schedules; calculate durations from quantities and production rates; assign labour, plant, materials and costs; and establish approved baselines. They also learn to update progress, assess critical and near-critical paths, evaluate float, produce look-ahead plans, carry out schedule quality checks and prepare reports for management, clients and subcontractors.
Teaching combines short technical briefings with instructor demonstration, construction cases, guided software work, schedule reviews and group planning decisions. Cases reflect building, civil engineering, infrastructure and industrial-project conditions, including procurement constraints, design release dates, access restrictions, resource clashes and late progress reporting. Participants work with Primavera P6 from the first week and progressively build a detailed construction schedule rather than treating the software as a data-entry tool. They leave with a completed P6 programme, baseline and update pack, reporting templates, schedule review checklists and a repeatable method for controlling project time.
The course is suited to planners, engineers, project controls staff and project managers who already work with construction information and need to produce or review credible project schedules.


