Engineering Project Management Training Course

Duration 10 days 16 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Engineering Managers, Project Engineers and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 16 Nov 2026 Course code SD-PM-102

Before you join: Participants should have practical exposure to engineering, technical operations, construction, manufacturing, maintenance, utilities or capital projects.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Engineering projects fail when technical decisions, scope definition, schedules, interfaces, procurement and site constraints are managed separately. Engineering managers must convert design intent into controlled work packages, coordinate disciplines and contractors, make informed trade-offs, and report credible forecasts to sponsors. This requires more than a Gantt chart: it requires an integrated management system that connects requirements, cost, schedule, risk, quality, safety and change control.

This course develops the practical project management capability required to lead engineering design, construction, manufacturing, infrastructure, maintenance and capital-investment projects. Participants apply PMBOK® Guide principles, ISO 21502 concepts, work breakdown structures, network scheduling, Critical Path Method, resource planning, cost estimating, earned value management, risk registers, interface management and formal change control. They learn how to establish a project baseline, assess progress, manage contractors and suppliers, control technical changes, and communicate decisions to engineering teams and senior stakeholders.

Instructor-led sessions combine focused briefings with engineering cases, group analysis, planning simulations and structured application to participants’ own project work. Participants progressively build an integrated project management pack during the course, then test it against realistic events such as delayed equipment delivery, design revisions, resource shortages and cost variance. They leave with reusable planning and control templates, a reviewed project baseline, and a clear action plan for applying the methods to a current or forthcoming engineering project.

The course is suited to engineering professionals moving into project leadership, project managers seeking stronger technical-project controls, and functional managers accountable for engineering work delivered through projects.

What you will be able to do

  • Define an engineering project charter, scope statement and measurable acceptance criteria
  • Build a deliverable-based work breakdown structure and responsibility assignment matrix
  • Develop a logic-linked schedule using Critical Path Method and resource assumptions
  • Prepare a cost baseline, cash-flow forecast and earned value measurement plan
  • Assess technical, commercial and delivery risks using a structured risk register
  • Control engineering changes through impact analysis, approval authorities and baseline updates
  • Manage contractors, interfaces and stakeholder communications using defined control plans
  • Present an integrated engineering project management plan supported by credible forecasts

Benefits of attending

For you

  • Produce credible engineering project baselines for management approval
  • Identify schedule drivers before they become delivery delays
  • Explain cost and progress variance using earned value measures
  • Handle technical changes with documented impact and authority controls
  • Lead clearer project reviews with engineers, contractors and sponsors

For your organisation

  • Improves alignment between engineering scope, schedule, cost and acceptance criteria
  • Reduces unapproved scope growth and late technical-change disruption
  • Strengthens early warning of schedule slippage, cost variance and delivery risk
  • Creates more consistent contractor reporting and interface-management practices
  • Improves governance evidence for capital projects, shutdowns and technical investments

Course modules

16 modules over 10 days

Participants can distinguish engineering project delivery responsibilities, governance roles and lifecycle decision points.

  • Engineering projects distinguished from operations, maintenance and routine technical work
  • Project lifecycle gates from concept selection through commissioning and handover
  • Sponsor, project manager and technical authority accountabilities defined clearly
  • Governance structures for capital, infrastructure and industrial engineering projects
  • Stage-gate decisions supported by technical, commercial and delivery evidence
  • Project success criteria balancing safety, performance, cost, schedule and quality

Participants can define a justified project mandate with clear objectives, constraints and approval requirements.

  • Project charters linking business need, engineering objectives and expected benefits
  • SMART objectives translated into measurable technical and operational outcomes
  • Assumptions, constraints and dependencies recorded within the initiation document
  • Option appraisal using cost, risk, operability and constructability criteria
  • Preliminary business cases separating capital expenditure from operating expenditure
  • Approval routes, delegated authorities and project tolerances established early

Participants can convert stakeholder needs into controlled engineering requirements and scope boundaries.

  • Requirements traceability matrices connecting needs, specifications, tests and acceptance
  • User requirements separated from design solutions and supplier proposals
  • Scope statements defining inclusions, exclusions, boundaries and deliverable conditions
  • Acceptance criteria specified for design, fabrication, installation and commissioning
  • Interface requirements identified between disciplines, systems, sites and suppliers
  • Scope creep indicators recognised before unapproved work consumes contingency

Participants can create a deliverable-based work breakdown structure with clear ownership.

  • Deliverable-based work breakdown structures decomposed to controllable work packages
  • Work package definitions covering outputs, ownership, duration and acceptance criteria
  • Responsibility assignment matrices using RACI roles for technical deliverables
  • Control accounts connecting scope, budget, schedule and accountable managers
  • Engineering disciplines coordinated through defined package and interface ownership
  • Work authorisation boundaries established between client, contractor and supplier teams

Participants can develop a logic-linked engineering schedule and identify its critical path.

  • Activity networks built from work packages, dependencies and engineering deliverables
  • Finish-to-start, start-to-start and lag relationships selected appropriately
  • Critical Path Method calculations identifying float, critical activities and constraints
  • Design, procurement, fabrication and construction sequences linked logically
  • Milestones defined for approvals, long-lead equipment and commissioning readiness
  • Schedule assumptions documented for productivity, access, permits and weather conditions

Participants can assess resource demand, capacity constraints and practical schedule options.

  • Resource loading applied to engineering hours, crews, equipment and specialist services
  • Capacity plans compared against internal availability and contractor mobilisation dates
  • Resource levelling evaluated against schedule float, cost and delivery risk
  • Skill constraints identified for design reviews, testing and commissioning activities
  • Make-or-buy decisions assessed using capacity, capability and commercial criteria
  • Resource histograms used to explain peak demand and staffing gaps

Participants can prepare an engineering project cost baseline with transparent estimating assumptions.

  • Class estimates matched to project maturity, scope definition and uncertainty
  • Bottom-up estimates built from quantities, labour rates, materials and equipment
  • Contingency allowances separated from management reserve and scope allowances
  • Cost breakdown structures aligned with work packages and control accounts
  • Time-phased budgets converted into monthly expenditure and cash-flow forecasts
  • Estimate basis documents recording exclusions, escalation and market assumptions

Participants can assess project uncertainty and assign proportionate response actions.

  • Risk registers capturing causes, events, consequences, owners and response actions
  • Probability-impact scoring calibrated for engineering safety, cost and schedule exposure
  • Bow-tie analysis applied to high-consequence technical and construction risks
  • Opportunities assessed alongside threats using value, feasibility and ownership criteria
  • Risk responses selected through avoid, reduce, transfer, accept and exploit strategies
  • Contingency drawdown linked to approved risk events and governance thresholds

Participants can establish quality controls that protect technical requirements and acceptance standards.

  • Quality management plans connecting specifications, inspections, tests and records
  • Inspection and test plans defining hold points, witness points and acceptance evidence
  • Design reviews structured around requirements, hazards, operability and maintainability
  • Non-conformance reports managed through containment, disposition and corrective action
  • Root cause analysis using five whys and fishbone diagrams
  • Configuration baselines protected through controlled drawings, specifications and revisions

Participants can plan procurement packages and manage contractor delivery against project controls.

  • Procurement strategies selected for design responsibility, market capacity and risk allocation
  • Bid packages defining scope, deliverables, schedules, standards and reporting requirements
  • Technical bid evaluations separated from commercial assessment and clarification management
  • Long-lead equipment tracked from requisition through manufacture, inspection and delivery
  • Contractor progress assessed against approved schedules, quantities and quality records
  • Supplier expediting plans focused on critical equipment, documents and manufacturing milestones

Participants can manage technical interfaces and communicate project decisions to affected stakeholders.

  • Interface registers documenting boundaries, deliverables, dependencies and responsible parties
  • Interface control documents governing physical, functional and data connections
  • Stakeholder mapping using power, interest, influence and impact assessments
  • Communication plans matched to decision rights, information needs and reporting frequency
  • Technical decisions presented with options, impacts, recommendations and approvals required
  • Community, regulator and operations concerns incorporated into project engagement plans

Participants can measure engineering project performance and forecast likely cost and schedule outcomes.

  • Progress measurement rules defined for design, procurement, construction and commissioning
  • Earned value measures calculated using planned value, earned value and actual cost
  • Schedule performance index and cost performance index interpreted cautiously
  • Estimate at completion forecast using current performance and remaining work assumptions
  • Milestone trend analysis used to identify emerging schedule movement
  • Weekly dashboards combining safety, quality, schedule, cost, risk and decisions

Participants can evaluate, approve and implement technical changes without losing baseline control.

  • Change requests documenting technical rationale, alternatives, impacts and recommended action
  • Impact analysis covering scope, cost, schedule, risk, quality and operability
  • Change control boards applying authority limits and recorded approval decisions
  • Configuration status accounting tracking approved versions, deviations and outstanding changes
  • Baseline updates authorised only after approved scope and funding decisions
  • Emergency changes controlled through retrospective review, evidence and corrective actions

Participants can run effective project reviews and prepare recovery plans for delivery variance.

  • Project status reports distinguishing facts, forecasts, decisions and unresolved issues
  • Look-ahead planning focused on near-term constraints, commitments and critical interfaces
  • Variance analysis tracing schedule and cost movement to underlying causes
  • Recovery schedules tested for resource feasibility, risk transfer and quality consequences
  • Decision logs maintained with owner, due date, rationale and closure evidence
  • Steering committee packs structured around exceptions, options and approval requests

Participants can plan controlled project handover, commissioning evidence and closeout activities.

  • Commissioning plans linking systems completion, testing, training and operational readiness
  • Punch lists prioritised by safety, functionality, documentation and handover impact
  • As-built records verified against installed equipment, drawings and configuration status
  • Operations handover packs including manuals, spares, warranties and maintenance requirements
  • Lessons learned captured through structured reviews of decisions and outcomes
  • Benefits handover assigned to operational owners after project closure

Participants can build, review and present a complete engineering project management plan for approval.

  • Project charter, scope baseline and requirements traceability assembled into one plan
  • Work breakdown structure, schedule and responsibility matrix checked for alignment
  • Cost baseline, cash forecast and earned value rules incorporated
  • Risk, quality, procurement, interface and change controls integrated coherently
  • Management review tests assumptions, constraints, decisions and recovery readiness
  • Formal presentation communicates project strategy, forecasts, risks and approval needs

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Engineering project charter template
  2. Deliverable-based work breakdown structure
  3. Logic-linked baseline schedule
  4. Cost baseline and cash-flow forecast
  5. Engineering risk and interface register
  6. Integrated project management plan

Who should attend

  • Engineering Managers — responsible for delivering technical work through projects
  • Project Engineers — coordinating design, procurement, construction or installation activities
  • Engineering Project Managers — seeking stronger planning and control disciplines
  • Design Managers — managing multidisciplinary design outputs and technical interfaces
  • Maintenance Managers — planning shutdowns, upgrades and asset-reliability projects
  • Technical Team Leaders — moving from specialist responsibility into project leadership

Skills and tools covered

Engineering project planningSchedule controlCost forecastingRisk managementChange controlContractor coordination

Tools and standards

PMBOK® Guide, ISO 21502, Critical Path Method, Earned Value Management

How the course runs

Training methodology

The course uses short instructor briefings followed by engineering-focused case work, group planning tasks, schedule and cost-control simulations, and peer review. Participants apply each method to a realistic project scenario and, where appropriate, to their own project. Facilitated discussions examine design interfaces, contractor coordination, procurement delays, technical change and reporting decisions. The final sessions bring the planning artefacts together into an integrated project management pack for review and presentation.

Requirements and prerequisites

Participants should have practical exposure to engineering, technical operations, construction, manufacturing, maintenance, utilities or capital projects. They should understand the basic sequence of work in their discipline and be comfortable reading simple schedules, budgets or technical documentation. Prior experience as a project manager is useful but not required. The course does not assume knowledge of PMBOK® Guide, ISO 21502, earned value management, scheduling software or formal contract administration. Participants benefit most when they bring a current, planned or recently completed engineering project as a reference case.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

Participants need practical familiarity with engineering or technical work, but do not need prior formal project management training. The course starts with project definition and builds through planning, control and closeout methods.

Bring details of a current, planned or recent engineering project if organisational policy permits. Useful materials include a scope statement, schedule, estimate, risk register or contractor report, although none is mandatory.

It is designed for engineering managers, project engineers, design managers, maintenance leaders and technical specialists taking on project responsibility. It also suits project managers working on technically complex capital or asset projects.

This course uses engineering delivery situations such as design coordination, long-lead procurement, contractor control, commissioning and technical change. Its methods connect technical scope and acceptance evidence directly to schedule, cost, risk and configuration control.

Participants can use the templates to structure a live project charter, work breakdown structure, baseline schedule, risk register and reporting pack. The methods are applicable to design projects, plant upgrades, construction packages, shutdowns and equipment installations.

Each training day runs from 08:30 to 16:30 and provides about 6.5 contact hours. The first part develops the project baseline; the second deepens controls for cost, risk, contractors, change, reporting and handover before the final capstone presentation.