Infrastructure Risk Assessment Using GIS Training Course

Duration 10 days 18 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends GIS Analysts, Asset Managers and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 16 Nov 2026 Course code SD-GRS-141

Before you join: Participants should be comfortable working with spreadsheet data, maps and basic GIS concepts such as layers, attributes and coordinate systems.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Infrastructure owners must make defensible decisions about where assets are exposed, which failures would cause the greatest disruption, and what mitigation should be funded first. GIS provides the spatial evidence needed to combine asset records with flood, landslide, earthquake, heat, wildfire, coastal and service-dependency data. The difficulty is not simply producing a risk map; it is defining credible scenarios, preparing data at suitable scale, selecting transparent scoring methods, documenting assumptions and communicating uncertainty to technical and non-technical decision-makers.

This course teaches participants to assess infrastructure risk using GIS and remote sensing methods. Participants build an asset risk model from the first week, covering data quality checks, geocoding, hazard mapping, exposure analysis, vulnerability scoring, consequence assessment and risk prioritisation. They apply ISO 31000 concepts, spatial multi-criteria decision analysis, raster and vector geoprocessing, terrain analysis, satellite image interpretation and network analysis. The course also addresses metadata, coordinate reference systems, sensitivity testing, map design and reporting requirements for investment, maintenance and emergency-planning decisions.

Teaching combines focused technical briefings, guided software demonstrations, realistic cases, team-based analysis and structured review sessions. Cases may include flood risk to transport corridors, slope failure near pipelines, wildfire exposure of power assets, and service disruption affecting water networks. Participants leave with a reusable GIS-based infrastructure risk assessment package: a documented geodatabase structure, hazard and exposure layers, a risk scoring model, prioritised asset outputs, map layouts and an implementation plan suitable for adaptation to their employer's asset portfolio.

The course suits professionals who work with infrastructure data, asset risk, resilience, emergency planning, capital programmes or geospatial analysis. It is particularly relevant where organisations need to justify mitigation priorities using traceable spatial evidence.

What you will be able to do

  • Prepare an infrastructure risk geodatabase using documented schemas, metadata and quality controls
  • Map natural and human-caused hazards from authoritative datasets and remote sensing imagery
  • Calculate asset exposure using spatial joins, overlays, buffers and raster zonal statistics
  • Develop vulnerability and consequence scores using an ISO 31000-aligned risk model
  • Apply weighted overlay and multi-criteria decision analysis to prioritise asset risks
  • Assess service disruption through network analysis and criticality mapping
  • Test risk-model assumptions using sensitivity analysis and uncertainty mapping
  • Produce and present a complete GIS-based infrastructure risk assessment package

Benefits of attending

For you

  • Build defensible asset-risk maps for capital, maintenance and resilience decisions
  • Translate remote sensing and hazard data into asset-specific risk evidence
  • Create transparent scoring models that withstand technical review
  • Communicate spatial uncertainty clearly to engineers, managers and funders
  • Add a reusable GIS risk assessment portfolio piece to professional credentials

For your organisation

  • Prioritise mitigation spending using traceable spatial risk evidence
  • Identify exposed critical assets before disruption, damage or service failures occur
  • Improve consistency between engineering, asset management and emergency planning teams
  • Document risk assumptions, datasets and scoring decisions for audit and review
  • Produce clearer investment cases for resilience, maintenance and adaptation programmes

Course modules

18 modules over 10 days

Participants can frame an infrastructure risk assessment with clear scope, scenarios and decision criteria.

  • Infrastructure risk components: hazard, exposure, vulnerability, consequence and likelihood
  • ISO 31000 principles applied to asset-level spatial risk assessments
  • Defining assessment objectives, spatial extent, time horizon and decisions
  • Risk scenarios for roads, utilities, buildings and communications assets
  • Distinguishing direct damage, service disruption and cascading consequences
  • Risk appetite statements translated into measurable mapping thresholds

Participants can design a structured geodatabase for infrastructure risk analysis.

  • Geodatabase schemas linking assets, hazards, vulnerabilities and consequence attributes
  • Unique asset identifiers maintained across engineering and GIS systems
  • Feature classes, domains and subtypes supporting controlled asset data entry
  • Relational tables for inspections, maintenance history and condition observations
  • Naming conventions and folder structures supporting reproducible risk analysis
  • Data dictionaries documenting fields, units, sources and update responsibilities

Participants can validate spatial datasets before using them in risk calculations.

  • Coordinate reference systems selected for local distance and area calculations
  • Datum transformations checked before combining multi-source infrastructure datasets
  • Positional accuracy assessed against asset location and hazard mapping requirements
  • Attribute completeness, validity and consistency checks using rule-based queries
  • Topology rules identifying gaps, overlaps, dangles and duplicate features
  • ISO 19115 metadata elements recorded for critical risk datasets

Participants can prepare asset inventories and assign defensible criticality classes.

  • Cleaning asset registers through field standardisation, joins and duplicate detection
  • Geocoding facility records and validating ambiguous location matches
  • Asset hierarchy models linking components, sites and service systems
  • Criticality criteria covering safety, service population, revenue and strategic function
  • Consequence matrices converting operational impacts into ranked criticality classes
  • Mapping critical assets, redundancy locations and single points of failure

Participants can select hazard datasets and define scenarios appropriate to asset decisions.

  • Authoritative hazard datasets evaluated for scale, currency, coverage and uncertainty
  • Return periods, exceedance probabilities and scenario likelihoods distinguished correctly
  • Flood, seismic, wildfire, heat and landslide hazard data structures
  • Historical event inventories used to validate hazard occurrence patterns
  • Scenario assumptions documented for current climate and future climate conditions
  • Hazard thresholds aligned with asset design standards and operating limits

Participants can interpret remote sensing products for hazard and asset-condition evidence.

  • Optical imagery interpreted using tone, texture, pattern and context
  • Multispectral indices identifying vegetation stress, burn severity and surface water
  • Synthetic aperture radar applications for flood extent and ground deformation
  • LiDAR-derived surfaces supporting terrain, vegetation and corridor assessments
  • Image dates, cloud cover and spatial resolution matched to decisions
  • Ground-truth observations used to confirm remotely sensed classifications

Participants can derive terrain and drainage indicators relevant to infrastructure exposure.

  • Digital elevation models checked for voids, sinks and vertical accuracy
  • Slope, aspect and curvature derived for terrain-instability screening
  • Flow direction and accumulation calculated using hydrological conditioning
  • Watershed boundaries delineated for culvert, bridge and drainage assessments
  • Topographic wetness index mapped to identify saturated ground conditions
  • Elevation profiles created along roads, pipelines and transmission corridors

Participants can quantify flood exposure for linear and point infrastructure assets.

  • Flood polygons compared across riverine, pluvial and coastal scenarios
  • Buffer analysis identifies assets near flood-prone channels and shorelines
  • Spatial intersections calculate exposed asset lengths, counts and replacement values
  • Raster zonal statistics summarise inundation depth within asset footprints
  • Bridge, culvert and pumping-station exposure assessed using local terrain
  • Flood exposure outputs classified by severity, confidence and intervention urgency

Participants can identify infrastructure corridors exposed to terrain and ground-movement hazards.

  • Landslide susceptibility factors combined from slope, geology, rainfall and land cover
  • Cut slopes and embankments screened using terrain derivatives and imagery
  • Erosion-prone reaches identified from drainage concentration and bare-soil indicators
  • InSAR displacement trends interpreted for subsidence and slope movement
  • Corridor segmentation supports location-specific geotechnical investigation priorities
  • Field verification points selected from high-risk terrain model outputs

Participants can calculate exposure measures using appropriate GIS overlay methods.

  • Spatial joins transfer hazard attributes to asset features and records
  • Intersect and identity operations calculate overlapping hazard exposure areas
  • Near analysis measures distances between assets and hazard sources
  • Raster reclassification converts continuous hazard values into exposure classes
  • Zonal statistics summarise hazard intensity by asset segment or site
  • Modifiable areal unit effects considered when aggregating exposure results

Participants can score asset vulnerability using physical condition and design information.

  • Vulnerability indicators selected from material, age, condition and design standards
  • Fragility curves relate hazard intensity to damage probability estimates
  • Condition inspection records converted into consistent vulnerability score classes
  • Design elevation, protective works and redundancy reduce vulnerability ratings
  • Expert elicitation structured using scoring rubrics and documented assumptions
  • Missing vulnerability data handled through confidence scores and conservative rules

Participants can assess operational consequences of asset failure and service interruption.

  • Consequence criteria distinguish life safety, environment, service and financial loss
  • Population catchments estimate people affected by infrastructure service outages
  • Critical facilities mapped against access routes and utility dependencies
  • Travel-time analysis estimates detour impacts from road or bridge closure
  • Dependency diagrams identify cascading failures between interconnected infrastructure systems
  • Consequence scores calibrated against organisational risk tolerance thresholds

Participants can model network disruption and identify critical links and dependencies.

  • Network datasets prepared with connectivity, impedance and restriction attributes
  • Origin-destination cost matrices quantify access under disruption scenarios
  • Shortest-path analysis identifies alternative routes for critical services
  • Betweenness centrality highlights network links with disproportionate operational importance
  • Utility dependency layers reveal shared corridors and co-located assets
  • Failure scenarios mapped to identify isolated communities and service zones

Participants can build a transparent spatial model combining hazard, vulnerability and consequence.

  • Weighted linear combination combines standardised hazard, vulnerability and consequence criteria
  • Analytic hierarchy process documents pairwise weighting of risk factors
  • Criteria normalisation converts mixed measurement scales into comparable scores
  • Constraint masks exclude unsuitable areas from priority intervention analysis
  • ModelBuilder or graphical workflows document repeatable geoprocessing sequences
  • Risk classes defined using natural breaks, quantiles and policy thresholds

Participants can test model reliability and communicate limitations responsibly.

  • Sensitivity analysis tests ranking changes under alternative factor weights
  • Monte Carlo simulation represents uncertainty in scores and probability estimates
  • Historical damage records compared against predicted risk class distributions
  • Receiver operating characteristic curves assess binary susceptibility model performance
  • Confidence surfaces distinguish strong evidence from sparse or uncertain data
  • Assumptions registers record limitations, decisions and required future improvements

Participants can convert spatial risk outputs into prioritised mitigation actions.

  • Risk matrices combine likelihood and consequence into treatment priorities
  • Asset ranking rules separate immediate action, monitoring and acceptance decisions
  • Mitigation options matched to hazard mechanisms and asset vulnerability drivers
  • Cost-effectiveness comparisons support drainage, protection, relocation and redundancy choices
  • Residual risk estimated after proposed controls and adaptation measures
  • Implementation roadmaps assign owners, milestones, evidence and review triggers

Participants can communicate infrastructure risk findings through clear spatial products and reports.

  • Map layouts apply visual hierarchy, scale bars, legends and source notes
  • Risk symbology distinguishes likelihood, consequence, confidence and treatment priorities
  • Web maps and dashboards present filtered asset-risk information for managers
  • Technical reports document methods, datasets, assumptions and validation findings
  • Executive briefings connect mapped risk patterns to investment decisions
  • Version control procedures preserve approved maps, models and source data

Participants can build, review and present a complete GIS-based infrastructure risk assessment for a defined asset portfolio.

  • Define the asset portfolio, decision question, scenarios and assessment boundaries
  • Prepare documented asset, hazard, terrain and consequence data layers
  • Build exposure, vulnerability and consequence models using selected GIS methods
  • Calculate prioritised risk scores and test sensitivity to key assumptions
  • Produce risk maps, treatment priorities and an implementation roadmap
  • Present findings, limitations and recommendations to a technical review panel

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Infrastructure risk assessment geodatabase template
  2. Asset criticality and consequence scoring matrix
  3. GIS hazard-exposure-vulnerability model
  4. Risk-model assumptions and uncertainty register
  5. Prioritised mitigation action plan
  6. Infrastructure risk map and reporting template

Who should attend

  • GIS Analysts — need repeatable methods for spatial infrastructure risk modelling
  • Asset Managers — need defensible evidence for maintenance and renewal priorities
  • Infrastructure Planners — need to screen projects against hazard and resilience criteria
  • Risk Managers — need spatial inputs for enterprise and operational risk assessments
  • Emergency Planning Officers — need mapped consequences and response-priority information
  • Engineering Project Managers — need location-based evidence for design and mitigation decisions

Skills and tools covered

Spatial risk modellingHazard mappingAsset criticality analysisRemote sensing interpretationRisk prioritisationGIS reporting

Tools and standards

QGIS, ArcGIS Pro, ISO 31000, ISO 19115

How the course runs

Training methodology

The course uses short instructor briefings followed by guided GIS demonstrations, case-based analysis and structured group review. Participants work with representative infrastructure asset registers, hazard layers, satellite imagery and service-network data, adapting methods to their own asset context where suitable. Simulations examine competing mitigation priorities, incomplete data and changing hazard assumptions. Each stage includes application planning, peer critique and instructor feedback. Classroom delivery uses installed GIS software; live online delivery uses shared demonstrations, breakout analysis and supported file-based work.

Requirements and prerequisites

Participants should be comfortable working with spreadsheet data, maps and basic GIS concepts such as layers, attributes and coordinate systems. Prior experience using QGIS, ArcGIS Pro or similar desktop GIS software is beneficial, including opening datasets and performing simple selections. Participants should understand the infrastructure assets or services relevant to their role, such as roads, utilities, buildings or telecommunications. Programming, advanced statistics, prior remote sensing analysis and engineering design qualifications are not required. The course explains risk-model assumptions and GIS procedures before participants apply them.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

Participants should understand basic GIS layers, attribute tables and map coordinates. Experience opening and querying data in QGIS, ArcGIS Pro or similar software is useful, but advanced spatial analysis and programming are not required.

Bring a laptop if attending live online, with the nominated GIS software installed where possible. Participants may also bring non-sensitive asset registers, hazard maps or project questions, subject to their employer's data-security rules.

The course is designed for GIS analysts, asset managers, planners, risk professionals, engineers and emergency planning staff. It is most useful for people responsible for infrastructure portfolios or location-based resilience decisions.

General GIS courses focus on software functions, while this course applies those functions to risk assessment decisions. It also covers asset criticality, consequence modelling, treatment prioritisation, uncertainty and technical reporting.

Participants can adapt the geodatabase, scoring model and reporting templates to a road network, utility system, facilities portfolio or capital programme. The methods support risk registers, maintenance plans, resilience investment cases and emergency preparedness work.

The first week establishes risk concepts, data structures, hazard evidence and exposure analysis while participants begin building spatial outputs. The second week develops vulnerability, consequence, network, prioritisation and reporting methods, ending with a complete capstone assessment presentation.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.