Intermodal Terminal Operations Training Course

Duration 10 days 20 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Terminal Operations Managers, Yard and Gate Supervisors and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 16 Nov 2026 Course code SD-MP-030

Before you join: Participants should have basic experience of port, terminal, shipping, freight forwarding, rail freight, road transport or warehouse operations.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Intermodal terminals sit between shipping lines, rail operators, road carriers, freight forwarders, customs authorities and cargo owners. Delays or poor handovers at any interface can create berth congestion, missed train departures, truck queues, container dwell, cargo damage and avoidable cost. Terminal supervisors and planners need to make sound decisions using live operational data while maintaining safety, security, service commitments and regulatory compliance.

This course examines how container, RoRo and general cargo terminal activities are planned, controlled and measured across vessel, yard, gate, rail and inland transport interfaces. Participants learn berth and resource planning, yard strategy, stowage coordination, gate appointment control, rail terminal operations, equipment deployment, dangerous goods handling, documentation flows and disruption management. The course uses practical terminal operating concepts including KPI trees, capacity calculations, critical-path planning, terminal operating system workflows, incident reporting and root-cause analysis.

Participants work with realistic operational scenarios drawn from port terminals, inland container depots, dry ports and rail-connected logistics hubs. Short instructor briefings are followed by cases, planning tasks, group discussions and operational simulations. During the programme, participants build components of an intermodal terminal operating plan, including process maps, capacity assumptions, resource plans, KPI controls and disruption responses. They leave with a completed terminal operating plan that can be adapted to their own facility, route, cargo mix and customer commitments.

The course suits professionals responsible for terminal performance, marine operations, yard control, gate management, rail coordination, cargo handling, customer service and transport planning. It is particularly relevant where terminals must improve throughput without compromising safety, cargo integrity or reliable connections to inland transport.

What you will be able to do

  • Map intermodal terminal flows from vessel discharge through inland transport release
  • Calculate berth, yard, gate and rail capacity using operational demand assumptions
  • Develop equipment deployment plans for container, RoRo and general cargo operations
  • Apply terminal operating system workflows to inventory, work orders and exception control
  • Build KPI trees linking productivity, dwell time, service reliability and cost
  • Prepare dangerous goods controls using IMDG Code segregation and documentation requirements
  • Lead disruption responses using incident command, recovery sequencing and stakeholder communications
  • Produce and present an intermodal terminal operating plan with measurable controls

Benefits of attending

For you

  • Greater confidence coordinating vessel, yard, gate and inland transport interfaces
  • Practical capacity calculations for daily terminal planning decisions
  • Stronger ability to diagnose dwell, congestion and missed-connection causes
  • A structured approach to equipment deployment and workforce coordination
  • A reusable operating plan for discussions with managers and terminal partners

For your organisation

  • Reduced container dwell through clearer yard, gate and release controls
  • Improved berth, crane, rail and truck resource utilisation
  • Fewer missed inland connections through coordinated planning procedures
  • Better safety and dangerous goods compliance across cargo handovers
  • Consistent performance reporting for customers, operators and port authorities

Course modules

20 modules over 10 days

Participants can map the physical, information and contractual interfaces governing an intermodal terminal.

  • Terminal roles, interfaces and value flows between vessel, rail and road
  • Container, RoRo and general cargo operating models compared
  • Cargo custody transfer points and associated operational accountabilities
  • Stakeholder map covering carriers, agents, authorities, forwarders and hauliers
  • Service-level agreements translated into measurable terminal operating commitments
  • Daily operating rhythm from pre-arrival planning through cargo release

Participants can assess how terminal layout and flow design affect throughput and congestion.

  • Quayside, yard, gate, rail and inspection area functions
  • Material flow mapping identifies travel distance, handoffs and bottlenecks
  • Capacity constraints distinguished between static space and handling resources
  • Container stack geometry, ground slots and stacking height assumptions
  • Traffic circulation plans separate pedestrians, trucks, equipment and visitors
  • Buffer areas sized for customs holds, inspections and damaged units

Participants can prepare berth and vessel working plans using demand, resource and timing data.

  • Berth window planning balances vessel arrival uncertainty and quay capacity
  • Vessel bay plans interpreted for discharge, loading and restow requirements
  • Crane intensity calculations link moves, work hours and departure targets
  • Critical-path method identifies activities threatening planned vessel completion
  • Lashing, twistlock and hatch-cover work integrated into gang planning
  • Marine coordination covers pilots, tugs, mooring and weather restrictions

Participants can allocate quay equipment and labour to meet vessel productivity targets safely.

  • Ship-to-shore crane cycles measured through gross and net productivity
  • Equipment deployment matrices match tasks, competencies and operating constraints
  • Labour gang composition reflects cargo type, equipment and safety controls
  • Shift handover briefings capture work status, hazards and outstanding exceptions
  • Planned maintenance windows incorporated within vessel and rail schedules
  • Equipment utilisation reviewed against idle time, waiting time and availability

Participants can design yard plans that support retrieval speed, segregation and stack productivity.

  • Yard zoning separates import, export, empties, reefer and inspection containers
  • Stacking strategy considers dwell time, weight, destination and pickup sequence
  • Rehandle ratios calculated from stacking rules and expected retrieval patterns
  • Import delivery planning prioritises customs status and truck appointment demand
  • Export receiving cut-offs connected to vessel load lists and stowage plans
  • Inventory accuracy controls reconcile physical location with terminal system records

Participants can use terminal operating system workflows to control inventory and operational exceptions.

  • Terminal operating system master data governs locations, equipment and cargo status
  • Work queues prioritised by vessel cut-off, appointment and rail departure
  • Electronic data interchange messages trigger arrival, discharge and release processes
  • Exception codes distinguish missing units, damage, holds and misroutes
  • Cycle-count procedures verify inventory accuracy without disrupting operations
  • Data-quality dashboards identify duplicate records, timing gaps and location errors

Participants can plan gate operations that reduce truck turnaround time and unsafe congestion.

  • Truck appointment systems balance demand peaks against lane capacity
  • Gate process mapping covers pre-advice, identification, inspection and interchange
  • Optical character recognition and RFID support automated gate verification
  • Interchange inspections record container condition, seals and chassis details
  • Turn-time measurement separates queueing, transaction and terminal service time
  • Escalation rules manage rejected transactions, late arrivals and documentation defects

Participants can coordinate rail operations with terminal handling plans and vessel schedules.

  • Rail slot planning aligns train paths, track occupancy and lift capacity
  • Train consists checked against wagon limits, cargo status and destination blocks
  • Rail loading sequences minimise reshuffles and support safe wagon access
  • Cut-off controls protect planned rail departures from late container arrivals
  • Handover protocols reconcile terminal inventory with rail operator manifests
  • Missed-connection procedures prioritise recovery options and customer notification

Participants can select handling methods and controls appropriate to cargo type and unit condition.

  • Container handling equipment compared by lift capacity, mobility and stack density
  • RoRo operations coordinate marshalling, vessel ramps and vehicle inspection
  • Breakbulk lift plans define slinging, spreaders, lifting points and exclusions
  • Cargo securing checks address lashing condition, seals and visible damage
  • Temperature-controlled cargo controls cover plug allocation, alarms and monitoring
  • Out-of-gauge cargo plans identify route clearances and handling restrictions

Participants can apply dangerous goods, security and documentation controls to terminal operations.

  • IMDG Code classes, labels and documentation checked before terminal acceptance
  • Segregation tables determine safe storage locations for incompatible dangerous goods
  • Emergency response information linked to container positions and cargo declarations
  • ISPS Code access controls protect restricted areas and critical infrastructure
  • Customs hold procedures separate released, uncleared and examination cargo
  • IMO FAL Convention data supports standardised maritime arrival formalities

Participants can identify operational risks and implement practical controls for terminal work.

  • Job safety analysis identifies task hazards, controls and responsible persons
  • Bow-tie analysis links threat controls, consequences and recovery barriers
  • Traffic management plans control equipment interaction, speed and blind spots
  • Permit-to-work systems govern high-risk maintenance and confined-space activities
  • Near-miss reporting captures weak signals before serious operational events
  • Safety observations distinguish unsafe acts, conditions and system failures

Participants can design performance measures and control routines for daily terminal management.

  • KPI trees connect throughput, productivity, dwell, reliability and cost
  • Crane moves per hour interpreted with operational delay codes
  • Yard occupancy thresholds trigger contingency actions before gridlock develops
  • Truck turnaround dashboards separate external arrivals from internal processing delays
  • Rail departure reliability measured against planned slot and handover times
  • Daily control-room meetings assign actions, owners, deadlines and escalation points

Participants can forecast operational demand and convert it into resource requirements.

  • Vessel schedules, booking data and seasonality inform volume forecasts
  • Workload profiles convert container moves into labour and equipment hours
  • Scenario planning tests peak demand, weather disruption and late arrivals
  • Queueing assumptions estimate gate lanes and inspection resource needs
  • Roster plans match certified personnel to shift workload requirements
  • Contingency capacity identifies rental equipment, overtime and alternate storage

Participants can coordinate terminal recovery following operational disruptions and service failures.

  • Incident command roles establish authority, communications and decision cadence
  • Recovery sequencing prioritises safety, cargo integrity and critical connections
  • Weather stoppage plans define thresholds, inspections and restart criteria
  • Equipment outage triage assesses redundancy, repair timing and workload transfer
  • Berth delay communications align shipping lines, pilots and inland operators
  • After-action reviews identify root causes, corrective actions and owners

Participants can manage customer commitments, service exceptions and cargo claims using clear evidence.

  • Customer service commitments translated into operational response times and measures
  • Service failure logs classify delay, damage, misdelivery and documentation cases
  • Chain-of-custody records support claims investigation and liability assessment
  • Photographic evidence standards record container condition at interchange points
  • Demurrage and detention triggers understood within terminal release processes
  • Escalation matrices route customer exceptions to authorised decision makers

Participants can integrate equipment maintenance requirements into terminal operating plans.

  • Preventive maintenance schedules protect availability of critical handling equipment
  • Mean time between failures tracks reliability across equipment classes
  • Mean time to repair measures maintenance response and restoration performance
  • Condition monitoring identifies early warning signs in cranes and vehicles
  • Spare-parts criticality analysis protects repair capability during peak operations
  • Maintenance-operating coordination releases equipment without disrupting priority workloads

Participants can incorporate environmental controls and community obligations into terminal operating routines.

  • Dust, noise and lighting controls linked to operating permits
  • Spill response plans address fuel, chemicals and cargo residues
  • Waste segregation procedures cover ship-generated, operational and hazardous waste
  • Energy monitoring tracks diesel consumption, shore power and equipment idling
  • Stormwater controls prevent contaminated runoff from reaching harbour waters
  • Community complaint logs assign investigation, response and corrective action

Participants can improve terminal processes using evidence-based analysis and controlled implementation.

  • Value stream mapping exposes waiting, rework and avoidable handoffs
  • Five Whys analysis traces recurring delays to controllable causes
  • Pareto charts prioritise operational losses by frequency and impact
  • Standard work defines sequence, timing, checks and escalation triggers
  • PDCA cycles test improvements before permanent operating procedure changes
  • Benefits tracking compares planned gains against measured operating results

Participants can assemble the core analyses and controls required for an integrated terminal operating plan.

  • Operating assumptions define volumes, cargo mix, schedules and service targets
  • Process maps connect vessel, yard, gate, rail and release activities
  • Capacity model tests berth, yard, equipment and gate constraints
  • Resource plan assigns equipment, labour, maintenance and contingency capacity
  • KPI dashboard sets targets, data sources, review cadence and actions
  • Risk register records hazards, controls, owners and escalation arrangements

Participants can build, review and present a complete intermodal terminal operating plan for a defined facility scenario.

  • Terminal operating plan integrates flows, capacity, resources, controls and measures
  • Assumptions tested against vessel, rail, truck and yard demand scenarios
  • Peer review challenges feasibility, safety controls and customer commitments
  • Management presentation explains priorities, trade-offs, costs and expected results
  • Implementation roadmap sequences actions, dependencies, owners and review milestones
  • Final revisions incorporate feedback into an accountable operating document

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Intermodal terminal operating plan template
  2. Berth, yard, gate and rail capacity model
  3. Terminal KPI tree and dashboard specification
  4. Equipment and labour deployment matrix
  5. Disruption response and recovery playbook
  6. Dangerous goods acceptance and segregation checklist

Who should attend

  • Terminal Operations Managers — coordinate productivity, service reliability and operating cost
  • Yard and Gate Supervisors — control container flows, equipment allocation and truck turnaround
  • Marine Operations Coordinators — align berth activity with vessel schedules and cargo readiness
  • Rail Terminal Planners — manage train slots, loading sequences and inland connections
  • Logistics and Transport Managers — improve handovers between ports, depots, rail and road carriers
  • Port Authority Operations Staff — monitor terminal performance, safety controls and concession obligations

Skills and tools covered

Terminal capacity planningYard optimisationIntermodal coordinationCargo handling controlOperational KPI managementDisruption response planning

Tools and standards

IMDG Code, ISPS Code, IMO FAL Convention, UN/EDIFACT

How the course runs

Training methodology

The programme combines short technical briefings with terminal cases, group planning tasks, operational simulations and structured review sessions. Participants interpret vessel schedules, rail plans, yard inventories, gate demand and equipment availability to make planning decisions. Cases examine congestion, late vessel arrivals, equipment outages, dangerous goods exceptions and missed inland connections. Facilitators use participant examples where appropriate, then guide application planning for each participant's terminal, depot or transport interface. Time is reserved for peer review of plans, assumptions and performance measures.

Requirements and prerequisites

Participants should have basic experience of port, terminal, shipping, freight forwarding, rail freight, road transport or warehouse operations. They should understand common freight documents, container terminology and the purpose of vessel, truck or rail schedules. Experience with a terminal operating system is useful but not essential. The course does not require engineering qualifications, advanced mathematics, prior knowledge of a specific port, or previous responsibility for vessel planning. Participants should be prepared to work with operational data, maps, timetables and capacity assumptions.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

Participants need basic familiarity with freight, terminal, shipping, transport or logistics operations. They do not need prior vessel planning experience, engineering qualifications or experience with a particular terminal operating system.

Participants should bring a laptop if possible, together with non-confidential examples of operating challenges, process maps, schedules or performance reports. Course materials and planning templates are provided.

The course is designed for supervisors, planners, coordinators and managers working in ports, container terminals, inland depots, rail terminals and transport operations. It also suits professionals moving into terminal-facing logistics roles.

Port management courses often focus on governance, policy, economics and port development, while shipping courses focus on vessel operations and commercial shipping. This programme concentrates on daily terminal execution across berth, yard, gate, rail and cargo handovers.

Participants can use the templates to review a current bottleneck, improve a handover process, define operational KPIs or prepare a resource plan. The final operating plan provides a structured basis for discussion with managers, customers and operating partners.

The programme runs from 08:30 to 16:30 each day, providing about 6.5 contact hours daily. Early modules establish terminal flow, planning and control methods; later modules address risk, disruption, improvement and the final integrated operating plan.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.