Course overview
Construction quality failures create rework, delay, disputed payment, safety exposure and dissatisfied asset owners. A quality manager or project engineer must translate drawings, specifications and contract requirements into controlled site activities, verifiable inspection records and prompt corrective action. This requires more than final inspection: quality must be planned before work starts, controlled during procurement and installation, and evidenced at handover.
This course develops the practical systems used to manage construction quality on building, infrastructure and industrial projects. Participants learn to interpret ISO 9001 requirements, prepare project quality plans, develop inspection and test plans, control materials, manage subcontractor quality, conduct inspections and maintain traceable records. They apply methods for nonconformance reporting, root-cause analysis, corrective action, internal auditing, quality metrics and defects management. The course also addresses the interface between quality, programme, commercial administration, health and safety, design coordination and commissioning.
Teaching combines focused briefings with construction cases, document reviews, group analysis, audit simulations and structured application planning. Participants progressively build a project quality management package using realistic drawings, specifications, procurement records, inspection points and quality incidents. They leave with reusable templates and a completed quality management package that can be adapted for a live project. Delivery is instructor-led over 10 days, either in a classroom in more than 50 cities or live online. Each training day runs from 08:30 to 16:30 and provides approximately 6.5 contact hours. Participants receive a certificate of completion.
The course is suited to construction professionals who already contribute to site delivery and need to take greater responsibility for quality planning, assurance, control or improvement.



