Multi-Shift Operations Management Training Course

Duration 10 days 21 modules · 65 contact hours
Level Intermediate Certificate on completion
Who attends Operations Managers, Production Managers and others
Fee from USD 2,200 KSh 190,000 for Kenyan organisations
Where 52 cities + online See dates by city
Next start 16 Nov 2026 Course code SD-OM-040

Before you join: Participants should have at least two years of experience in operations, production, logistics, maintenance, service delivery or workforce scheduling.

Dates & prices

Two start dates a month in every city, and live online on weekdays or weekends. Fees are per participant; classroom fees include tuition, materials, lunch and refreshments, and the certificate.

Suggest a date or city

Showing the next six months. Later dates, other cities and private deliveries for your team are available on request.

Course overview

Multi-shift operations place production, maintenance, logistics, customer service and safety under continuous pressure. Poorly designed shift systems create uneven staffing, missed handovers, rising overtime, delayed maintenance, inconsistent quality and fatigue-related risk. Managers must balance demand, labour availability, equipment capacity, statutory requirements and employee wellbeing while maintaining reliable performance through nights, weekends and peak periods.

This course develops the practical operating methods required to run 24-hour and extended-hours operations. Participants assess workload patterns, design shift rosters, calculate staffing requirements, establish handover controls and manage daily performance using visual management and tiered meetings. They apply Overall Equipment Effectiveness, standard work, SMED, root cause analysis, maintenance planning, inventory controls and fatigue-risk controls. The course also addresses team leadership, cross-shift communication, workforce consultation, incident learning and improvement planning.

Teaching combines short instructor briefings with sector-based cases, group analysis, operational simulations and structured application planning. Cases reflect manufacturing plants, utility control rooms, distribution centres, process industries, hospitals, transport operations and customer contact centres. Participants progressively build an operating pack for a real or representative multi-shift area, including its staffing model, shift pattern, handover process, performance board, escalation routes and improvement priorities. They receive a certificate of completion after attending the ten-day instructor-led programme.

The course suits managers and specialists responsible for production, service delivery, maintenance, warehousing, operations planning or workforce scheduling. It is particularly relevant where operations must sustain output, quality, safety and customer commitments beyond standard daytime hours.

What you will be able to do

  • Design shift patterns using demand, capacity, fatigue and coverage requirements
  • Calculate crew staffing requirements using workload, skill matrices and absence assumptions
  • Build standardised shift handover processes using checklists, escalation rules and control logs
  • Manage daily multi-shift performance through tiered meetings, visual boards and KPIs
  • Analyse equipment losses using Overall Equipment Effectiveness and loss-tree analysis
  • Apply fatigue-risk controls, safety management principles and incident escalation procedures
  • Lead cross-shift problem solving using A3 thinking, 5 Whys and PDCA
  • Produce a complete multi-shift operations management plan for an operating area

Benefits of attending

For you

  • Confidence designing practical rosters for continuous and extended-hours operations
  • Stronger evidence for staffing and overtime decisions using workload calculations
  • A repeatable method for controlling handovers between crews and functions
  • Improved ability to investigate recurring losses and present corrective actions
  • A documented operations management plan applicable to the participant’s work area

For your organisation

  • More consistent staffing coverage across peaks, nights, weekends and planned absences
  • Fewer communication failures between shifts, maintenance teams and support functions
  • Improved control of overtime, agency labour and avoidable schedule changes
  • Higher equipment availability and output through disciplined loss analysis
  • Reduced safety and quality risk through fatigue controls and standardised escalation

Course modules

21 modules over 10 days

Participants can define the operating model, control boundaries and performance requirements for a multi-shift area.

  • 24-hour operating model linking customer demand, assets, staffing and constraints
  • Shift-system types: fixed, rotating, continental, DuPont and compressed schedules
  • Operational boundaries between production, maintenance, logistics, quality and support teams
  • Service-level requirements converted into shift-level output and response expectations
  • Critical control points identified across startup, steady-state, changeover and shutdown
  • Accountability map using RACI for cross-shift operating decisions

Participants can translate demand patterns into capacity, workload and crew coverage requirements.

  • Demand profiles translated into hourly workload, crew requirements and bottlenecks
  • Takt time, cycle time and throughput compared for capacity planning
  • Capacity cushion set against demand volatility, downtime and staffing uncertainty
  • Bottleneck analysis identifies constraints limiting sustained multi-shift output
  • Queueing effects examined where variable arrivals create service backlogs
  • Workload forecast distinguishes planned volume, emergency work and rework

Participants can design defensible shift patterns that balance coverage, fatigue and cost.

  • Roster design balances coverage, rest periods, skills, preferences and statutory limits
  • Forward and backward rotation compared using fatigue and recovery criteria
  • Shift length assessed against task demands, travel time and night work
  • Coverage models account for holidays, sickness, training and planned absences
  • Overtime rules incorporated into rota design and labour-cost forecasting
  • Roster scenarios tested against peak demand, breakdowns and seasonal variation

Participants can calculate staffing needs and protect critical skills on every shift.

  • Crew-size calculation uses workload standards, productive hours and relief factors
  • Skill matrix identifies mandatory competencies, authorisations and single-point dependencies
  • Relief-factor calculation accounts for leave, sickness, training and absenteeism
  • Minimum safe staffing defined for normal, degraded and emergency conditions
  • Cross-training priorities selected from risk, demand and succession evidence
  • Agency and contractor deployment controlled through role, induction and supervision requirements

Participants can establish reliable handovers that preserve operational control between crews.

  • Standard handover checklist covers status, risks, work permits and exceptions
  • SBAR structure improves concise communication of critical operational information
  • Logbook standards distinguish facts, actions, ownership and completion evidence
  • Face-to-face overlap planned for high-risk transitions and complex process changes
  • Escalation triggers define when outgoing crews retain responsibility for unresolved issues
  • Digital handover records controlled through timestamps, approvals and audit trails

Participants can standardise recurring work while allowing controlled responses to variation.

  • Standard work documents sequence, timing, quality points and safety controls
  • Leader standard work sets daily checks, coaching routines and escalation duties
  • Job breakdown sheets capture key steps, reasons and critical precautions
  • Standard operating procedures governed through version control and document ownership
  • Abnormal-condition response cards guide immediate containment and escalation actions
  • Change-control process updates standard work after approved operating changes

Participants can run visual daily management routines that connect shifts to management decisions.

  • SQDCP board tracks safety, quality, delivery, cost and people measures
  • Tiered meetings connect frontline issues with departmental and site-level decisions
  • Plan-versus-actual charts expose hourly deviation from operational targets
  • Andon escalation rules specify response time, ownership and closure evidence
  • Daily accountability board records actions, due dates and blocking issues
  • Shift-start meetings align priorities, hazards, staffing changes and planned work

Participants can select and interpret measures that reveal shift-level performance losses.

  • KPI hierarchy links shift measures to site targets and customer commitments
  • Leading indicators track conditions preceding safety, quality and delivery failures
  • Lagging indicators used carefully for trend analysis and performance review
  • Control charts distinguish common-cause variation from special-cause operational signals
  • Shift comparison avoids misleading conclusions from unequal demand and product mix
  • Data-definition sheets standardise metric formulas, sources, owners and reporting frequency

Participants can quantify equipment losses and prioritise improvement actions using OEE.

  • Overall Equipment Effectiveness combines availability, performance and quality loss measures
  • Six big losses classify breakdowns, setup, idling, speed and defect losses
  • Loss-tree analysis separates chronic losses from isolated major events
  • Pareto charts rank downtime causes by duration, frequency and production impact
  • SMED analysis separates internal and external changeover activities
  • Micro-stoppage data captured through operator logs and machine event records

Participants can maintain consistent quality controls, release decisions and defect learning across shifts.

  • Control plans define checks, frequencies, specifications and reaction plans
  • First-off approval confirms setup quality before sustained production begins
  • Statistical process control monitors variation at defined process control points
  • Nonconformance containment protects customers while root causes are investigated
  • Shift-to-shift defect analysis identifies recurring conditions and ownership gaps
  • Layered process audits verify critical controls during all operating hours

Participants can coordinate operations and maintenance to improve asset reliability across shifts.

  • Planned maintenance windows aligned with demand, shutdowns and operating constraints
  • Maintenance backlog prioritised by safety, production risk and asset criticality
  • Permit-to-work coordination protects simultaneous operations and maintenance activities
  • Operator care routines cover inspection, cleaning, lubrication and minor adjustment
  • Failure reporting captures symptoms, conditions, response and recurrence details
  • Reliability-centred maintenance principles guide task selection for critical assets

Participants can control material availability, inventory accuracy and changeovers across all shifts.

  • Kanban replenishment signals match consumption rates, lead times and buffer stock
  • Point-of-use inventory controls prevent shortages, excess stock and searching time
  • Cycle counting routines maintain inventory accuracy across overnight operations
  • Material shortages escalated through defined substitution, allocation and expediting rules
  • Changeover checklist coordinates materials, tooling, specifications and quality release
  • FIFO controls protect shelf-life, traceability and stock rotation requirements

Participants can apply fatigue and safety controls appropriate to night work and extended shifts.

  • Fatigue-risk assessment considers shift timing, duration, workload and recovery
  • ISO 45001 principles applied to operational hazard reporting and control
  • Night-shift risk controls address reduced supervision, visibility and emergency response
  • Fit-for-work checks identify fatigue, impairment and capability concerns
  • Critical-task scheduling avoids high-risk work during predictable fatigue periods
  • Near-miss reporting encourages early intervention before serious operational events

Participants can introduce shift changes through structured consultation, communication and transition planning.

  • Schedule-change business case quantifies service, cost, safety and workforce effects
  • Stakeholder mapping identifies employees, unions, managers and affected support functions
  • Consultation plan sets information, feedback, decision and communication stages
  • Roster pilots test operational assumptions before permanent schedule implementation
  • Transition plans manage training, payroll changes, transport and childcare impacts
  • Post-implementation review measures acceptance, attendance, performance and unintended consequences

Participants can manage operational incidents through clear command, communication and recovery routines.

  • Incident classification distinguishes routine deviations from major operational emergencies
  • Escalation matrix assigns authority, notification paths and decision thresholds
  • First-response checklist prioritises people, containment, continuity and evidence preservation
  • Situation reports communicate status, impacts, decisions and resource needs
  • Business continuity procedures maintain critical service during workforce or asset disruption
  • Recovery planning sequences restart checks, quality verification and stakeholder updates

Participants can investigate recurring operational problems and control corrective actions to closure.

  • A3 problem solving frames background, condition, analysis, countermeasures and follow-up
  • 5 Whys probes causal chains without assigning premature individual blame
  • Fishbone diagrams organise potential causes across people, methods, machines and materials
  • Fault tree analysis examines combinations of failures causing critical events
  • Corrective-action register assigns owners, dates, verification and effectiveness checks
  • PDCA cycles test countermeasures before standardising successful operating changes

Participants can lead consistent performance, accountability and communication across separated crews.

  • Shift-leader routines balance production control, coaching, safety and escalation
  • Gemba walks examine actual work, conditions, barriers and standard adherence
  • Briefing techniques communicate priorities without overloading crews with information
  • Feedback conversations address performance gaps using observable facts and agreed actions
  • Recognition practices reinforce reporting, teamwork, improvement and safe decisions
  • Cross-shift conflict resolved through shared facts, operating standards and escalation

Participants can build an improvement pipeline from operational losses, employee ideas and strategic priorities.

  • Kaizen funnel captures improvement ideas from every crew and support function
  • Impact-effort matrix prioritises opportunities using value, risk and implementation difficulty
  • Value stream mapping identifies waiting, rework, transport and handoff delays
  • Benefit tracking separates validated savings from estimated operational improvements
  • Improvement charters define problem, scope, measures, sponsors and expected benefits
  • Standardisation plan embeds approved improvements into training, procedures and audits

Participants can set practical data governance and reporting controls for multi-shift decision making.

  • Shift data architecture defines sources, timestamps, ownership and approval controls
  • Dashboard design presents exceptions, trends, constraints and required decisions
  • Data-quality checks detect missing entries, duplicate records and implausible values
  • Electronic logbooks improve traceability while retaining clear handover accountability
  • Access controls protect sensitive staffing, safety and production information
  • Reporting cadence aligns shift, daily, weekly and monthly management decisions

Participants can plan the controlled implementation of a multi-shift operating improvement.

  • Implementation roadmap sequences pilot, review, rollout, stabilisation and audit stages
  • Milestone plan identifies dependencies, approvals, resources and decision gates
  • Risk register assesses operational, workforce, safety and technology implementation risks
  • Training matrix schedules competence development before changed work begins
  • Communication calendar coordinates messages for crews, managers and support teams
  • Thirty-sixty-ninety-day review plan measures adoption, results and corrective actions

Participants can build, review and present a complete multi-shift operations management plan for a defined operating area.

  • Operating-area profile defines demand, assets, workflows, constraints and customer commitments
  • Shift pattern and staffing model tested against workload and absence scenarios
  • Handover process specifies records, meetings, escalation triggers and accountability
  • Performance board combines SQDCP measures, targets, thresholds and review cadence
  • Risk controls address fatigue, safety, quality, maintenance and service continuity
  • Implementation plan presents priorities, milestones, owners, measures and governance

Exercises and examples are adapted to each cohort's sectors and roles.

What you take back to work

  1. Multi-shift operating model template
  2. Shift roster and staffing calculator
  3. Standardised handover checklist and logbook template
  4. SQDCP daily management board
  5. Fatigue and operational risk assessment
  6. Multi-shift operations management plan

Who should attend

  • Operations Managers — responsible for output, service, safety and labour performance across shifts
  • Production Managers — need stable throughput, quality control and effective crew deployment
  • Shift Managers — require disciplined handovers, escalation routines and team leadership methods
  • Maintenance Managers — coordinate planned work, breakdown response and asset availability across crews
  • Warehouse and Logistics Managers — manage continuous fulfilment, dispatch coverage and inventory flow
  • Workforce Planning Specialists — build staffing models and rota arrangements against changing demand

Skills and tools covered

Shift pattern designWorkforce capacity planningShift handover controlDaily performance managementFatigue risk managementContinuous improvement leadership

Tools and standards

Overall Equipment Effectiveness, SMED, RACI, ISO 45001

How the course runs

Training methodology

The programme uses short briefings to introduce operating methods, followed by cases, group analysis and applied planning. Participants interpret demand profiles, staffing data, loss data and shift reports drawn from realistic operational settings. Simulations test handovers, escalation decisions, daily tier meetings and response to changing conditions. Facilitated peer review helps participants challenge assumptions in roster design, staffing coverage and improvement priorities. Throughout the course, participants develop components of an operating pack that they consolidate, review and present during the final capstone module.

Requirements and prerequisites

Participants should have at least two years of experience in operations, production, logistics, maintenance, service delivery or workforce scheduling. They should understand their area’s basic workflow, staffing arrangements, performance measures and escalation routes. Familiarity with spreadsheets and routine operational reporting is useful because participants will work with staffing, capacity and performance data. Prior formal training in operations management, industrial engineering, Lean or project management is not required. The course does not require advanced mathematics, specialist scheduling software or prior responsibility for a 24-hour operation.

A typical training day

08:30 – 10:30First session
10:30 – 10:45Refreshment break
10:45 – 12:30Second session
12:30 – 13:30Lunch and networking
13:30 – 15:00Third session
15:00 – 15:15Refreshment break
15:15 – 16:30Workshop and daily review

Live online deliveries follow the same structure in East Africa Time, with shorter screen blocks and longer breaks.

What the fee includes

  • Instruction by a practitioner facilitator
  • Full course workbook and materials
  • Exercise files, templates and case studies
  • Refreshments and lunch on classroom deliveries
  • Certificate of completion
  • Post-course application plan

Frequently asked questions

Participants should have practical experience in an operational, production, maintenance, logistics or service-delivery role. Formal Lean, industrial engineering or workforce-planning qualifications are not required.

Participants should bring a laptop if possible, plus non-sensitive examples of shift patterns, workload data, KPIs, handover forms or recurring operational issues. The trainer will provide course materials and templates.

It is designed for managers, supervisors and specialists responsible for work conducted across shifts, nights, weekends or extended hours. It also suits professionals preparing to introduce a new shift system or improve an existing one.

Lean courses focus mainly on waste reduction and flow, while workforce planning courses often focus on headcount forecasting and talent supply. This course concentrates on the day-to-day operating system needed to run work reliably across multiple crews and time periods.

Participants build an operating pack during the course using their own area where suitable. The pack can be used to review shift coverage, improve handovers, strengthen daily control and structure improvement activity.

Each training day runs from 08:30 to 16:30 and provides about 6.5 contact hours. The first week builds core controls for staffing, handovers, performance and reliability; the second week addresses risk, leadership, improvement and the final capstone presentation.

Questions about this course?

Ask about dates, fees, group bookings or running it for your team. Our training team replies by email.